Permit Application Status

PRBD202100633


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRBD202100633
Building
Finaled
MOAC MALL HOLDINGS LLC
Alteration/Repair/Replace
Not Required
New tenant improvement of an existing lease space of approximately 1870 S.F. The new eyeglass retail store, located in the Mall of America, space W158, will include an eye exam office within the mercantile space. Scope of work includes new interior tenant fit-out including storefront, partitions, doors, ceilings, finishes and associated mechanical, electrical and plumbing work. Storefront signage to be filed under separate permit.
01/19/2021
03/26/2021
12/13/2021
06/16/2021

Locations

Permits

Permit Number: PRBD202100633

Building
Finaled
03/26/2021
12/13/2021

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Progress Inspection Partial Pass 04/26/2021
Corrections:


Miscellaneous/Other
Comment Only
04/26/2021
Wall framing for exam room, office, etc. behind sales area ... approved to cover. Furred walls at demising walls ok to cover.

Framing Inspection Partial Pass 4/27/2021 (8:00 - 10:00) 4/27/2021 (AM) 04/27/2021
Corrections:


Miscellaneous/Other
Comment Only
04/27/2021
Progress/information inspection... Electrical boxes installed at the back of house rated cooridor wall to have putty packs installed to them and to be verified at inspection. Electrical that is terminated in portion wall of adjoining space to be removed. Also to be verified at inspection... Told electrical contractor as well.

Framing Inspection Partial Pass 4/28/2021 (12:30 - 2:30) 4/28/2021 (PM) 04/28/2021
Corrections:


Miscellaneous/Other
Comment Only
04/28/2021
Ceiling framing and above ceiling in back of sales area ( bathroom, breath room, exam, and office)... approved.... Pending trades inspections prior to covering.

Framing Inspection Passed 5/6/2021 (12:30 - 2:30) 5/6/2021 (PM) 05/06/2021
Corrections:


Miscellaneous/Other
Comment Only
05/06/2021
Sales floor ceiling and above ceiling, and storefront framing... approved

Progress Inspection Passed w/ Conditions 5/19/2021 (12:30 - 2:30) 5/19/2021 (PM) 05/19/2021
Corrections:


Miscellaneous/Other
Comment Only
05/19/2021
Ceiling framing and above ceiling in managers ffice and break room approved. Note... empty electrical box in above ceiling over the back of house door to be covered with gypsum to maintain wall rating.

Fire Inspection Final Passed 06/11/2021
Building Final Inspection Partial Pass 6/14/2021 (12:30 - 2:30) 6/14/2021 (PM) 06/14/2021
Corrections:


Miscellaneous/Other
Comment Only
06/14/2021
Approved for setup, stock and training. Clean space for final.

Building Final Inspection Passed 6/16/2021 (10:00 - 12:00) 6/16/2021 (AM) 06/16/2021
Corrections:


Miscellaneous/Other
Comment Only
06/16/2021
Final for this permit approved approved.