PRBD202101754
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Building Final Inspection | Pending | |||
Framing Inspection | Partial Pass | 3/26/2021 (2:30 - 3:30) | 3/26/2021 (PM) | 03/29/2021 |
A. New 2x6 ceiling rafters are not fire treated lumber. B. New wall studs are fire treated Dricon brand. C. Must cover ceiling rafters with gypsum, and confirm masonry separation walls to roof deck. D. Remove ceiling tiles for all inspections. E. Must have city approved plans on site. Contact Ken Vingie with Kraus Anderson for information on attaining approved plans from the City of Bloomington Portal. | ||||
Corrections:
Miscellaneous/Other
Outstanding
03/29/2021
Framing - partial pass only. A. Contractor must print and provide for approved plans on site for all trade inspections. B. 2x6 ceiling rafters installed already are not fire treated lumber, but suggest covering ceiling rafters with gypsum, and adding additional sprinkler heads above per Bloomington fire marshal.
|
||||
Framing Inspection | Not Ready | 4/5/2021 (10:00 - 12:00) | 4/5/2021 (AM) | 04/05/2021 |
Spoke with Kal, he needs to reschedule, he was not there today. A. He still needs to have fire marshal look above ceiling, and could you schedule also Lance Stanghor fore marshal rough in for same time frame. | ||||
Corrections:
Miscellaneous/Other
Carried Forward
04/05/2021
Framing - partial pass only. A. Contractor must print and provide for approved plans on site for all trade inspections. B. 2x6 ceiling rafters installed already are not fire treated lumber, but suggest covering ceiling rafters with gypsum, and adding additional sprinkler heads above per Bloomington fire marshal.
|
||||
Framing Inspection | Partial Pass | 4/6/2021 (12:30 - 2:30) | 4/6/2021 (PM) | 04/06/2021 |
See corrections. | ||||
Corrections:
Miscellaneous/Other
Carried Forward
04/06/2021
Framing - partial pass only.
A. Complete screw fasten, all fire treated plywood, into the wood ceiling joists. Screw spacing -
MAXIMUM SPACING 8 INCHES.
B. Contractor must completely cover the top surface and behind large sprinkler pipe top surface, and all 3 perimeter edges, gaps and openings, with 5/8 gypsum and screws.
C. Fire caulk - all small gaps around the 2 sprinkler heads.
D. Also cover with gypsum and fasten the rear most edge perimiter at rear area of suite, with
E. Call for reinspection.
F. Electrical permit required to reinstall exit signs having emergency lighting, and all 2 x 4 ceiling lites.
|
||||
Framing Inspection | Passed | 4/14/2021 (2:30 - 3:30) | 4/14/2021 (PM) | 04/14/2021 |
Per building inspector #25, Electrical contractor required for store front sign, and open junction boxes above ceiling, and proper wire to support ceiling grid and ceiling recessed lights. | ||||
Corrections:
Miscellaneous/Other
Outstanding
04/06/2021
Framing - partial pass only.
A. Complete screw fasten, all fire treated plywood, into the wood ceiling joists. Screw spacing -
MAXIMUM SPACING 8 INCHES.
B. Contractor must completely cover the top surface and behind large sprinkler pipe top surface, and all 3 perimeter edges, gaps and openings, with 5/8 gypsum and screws.
C. Fire caulk - all small gaps around the 2 sprinkler heads.
D. Also cover with gypsum and fasten the rear most edge perimiter at rear area of suite, with
E. Call for reinspection.
F. Electrical permit required to reinstall exit signs having emergency lighting, and all 2 x 4 ceiling lites.
|
||||
Fire Inspection Final | VOID | 5/19/2021 (10:00 - 12:00) | 5/19/2021 (AM) | 05/19/2021 |
Building Final Inspection | Not Ready | 5/19/2021 (10:00 - 12:00) | 5/19/2021 (AM) | 05/19/2021 |
Need sign permit from planning, with separate electrical and sign permit. Need electrical permit, with rough in and final inspections for interior above ceiling and open boxes above humidor. | ||||
Corrections:
Miscellaneous/Other
Carried Forward
05/19/2021
Need 2 electrical permits - and one exterior sign permit.
1 electrical permit for store interior above ceiling.
1 electrical permit for new exterior sign.
Need fire marshal final.
Signature on card and permit # not valid or legitimate.
|
||||
Fire Inspection Final | Passed | 5/19/2021 | 05/20/2021 | |
Building Final Inspection | Not Ready | 6/7/2021 (8:00 - 10:00) | 6/7/2021 (AM) | 06/07/2021 |
Mohamed - store contact. 612 - 619-5208. Need electrical permit - in plan review status. | ||||
Building Final Inspection | Passed | 10/13/2021 (8:00 - 10:00) | 10/13/2021 (AM) | 11/04/2021 |
Need electrical permit for electrical work performed INSIDE the store. ELECTRICAL CONTRACTOR DAMON, PERFORMED WORK INSIDE THE STORE. |