Summary

PRBD202101793
Building
Finaled
GKII NORTHLAND CENTER LLC
Alteration/Repair/Replace
Not Required
TENANT IMPROVEMENT INCLUDING EMPLOYEE BREAKROOM, OFFICES, AND CONFERENCE ROOMS. NO CHANGE IN USE OR OCCUPANCY. INCLUDES MINOR WORK TO BASEMENT STORAGE ROOM, WITH NEW WALK-IN FREEZER BY OTHERS.
02/23/2021
04/06/2021
06/07/2022

Locations

Permits

Permit Number: PRBD202101793

Building
Finaled
04/06/2021
06/07/2022

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Framing Inspection Passed 5/17/2021 (8:00 - 10:00) 5/17/2021 (AM) 05/17/2021
Note - type 1 kitchen exhaust ansul system required per plan review.
Progress Inspection Not Ready 6/9/2021 (10:00 - 12:00) 6/9/2021 (AM) 06/09/2021
Progress
Corrections:


Miscellaneous/Other
Comment Only
06/09/2021
Building inspections - Above ceiling. A. Dead end corridor at bathrooms. 1 hr rated. B. Needs 1 hr rated continuous gypsum to deck from inside the tenant space. Call for re inspection when ready. C. Brian Post - city inspector. cell 952-292-1549. THANKS ROB.

Framing Inspection Passed 6/30/2021 (12:30 - 2:30) 6/30/2021 (PM) 06/30/2021
Framing - passed. A. Need to inspect fire caulk above new hard lid ceiling, housing new kitchen exhaust system to the exterior west side 6th floor, roof soffit vent, and above the gas and electric ranges, prior to covering.
Building Final Inspection Passed w/ Conditions 7/9/2021 (8:00 - 10:00) 7/9/2021 (AM) 07/09/2021
Temp CO. Office’s and conference rooms. A. Need kitchen 3 compartment sinks and plumbing final. B. Need to post max occupancy signage, per page 2 of city approved plans. C. Néed all sac charges paid. Confirm amount due with B.Gillespie. D. Need HVAC FINAL AND PLUMBING FINAL for the kitchen with exhaust hoods. E. Need electrical final inspection, and fire final. F. Issue temp CO for north end offices and conference rooms, etc. G. Fire caulk open holes for the existing electrical room,
Corrections:


Miscellaneous/Other
Outstanding
07/09/2021
Temp CO for offices and conference rooms only, not kitchen area. A. Fire caulk electrical rooms - all penetrations. B. Post max occupancy signage per plan page 2. C. Need HVAC FINAL FOR NEW KITCHEN AREA WITH PANIC BAR EXIT HARDWARE. D. Néed sac charges paid. E. NEED FIRE FINAL AND ELECTRICAL AND PLUMBING FINALS.

Fire Inspection Final Issue TCO 7/9/2021 (8:00 - 10:00) 7/9/2021 (AM) 07/09/2021
Building Final Inspection Passed 10/15/2021 (8:00 - 10:00) 10/15/2021 (AM) 10/15/2021
Fire Inspection Final Passed 12/09/2021