Permit Application Status

PRBD202103153


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRBD202103153
Building
Finaled
LIFESPACE COMMUNITIES INC
Alteration/Repair/Replace
Not Required
Remodel of interior of units at Friendship Village of Bloomington. They are looking to take 2 small units and make it into a combo. We will be doing some structural changes and interior finishes to the space.
03/25/2021
04/14/2021
07/02/2022
01/03/2022

Locations

Permits

Permit Number: PRBD202103153

Building
Finaled
04/14/2021
07/02/2022

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Footing Inspection Passed 4/16/2021 (8:00 - 10:00) 4/16/2021 (AM) 04/16/2021
First floor: A. C1 - column footing per structural engineer plan. Passed.
Framing Inspection Passed 7/6/2021 (8:00 - 10:00) 7/6/2021 (AM) 07/06/2021
Building Final Inspection Passed 12/29/2021 (8:00 - 10:00) 12/29/2021 (AM) 12/29/2021
Fire Inspection Final Passed 12/29/2021 (8:00 - 10:00) 12/29/2021 (AM) 01/03/2022