Permit Application Status

PRBD202104058


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRBD202104058
Building
Finaled
CITY OF BLOOMINGTON
New
Not Required
Ground-up construction of a 140,000 SF office, warehouse, and distribution center for SICK, Inc.
04/13/2021
07/07/2021
02/25/2023
08/25/2022

Locations

Permits

Permit Number: PRBD202104058

Building
Finaled
07/07/2021
02/25/2023

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Footing Inspection Partial Pass 7/13/2021 (12:30 - 2:30) 7/13/2021 (PM) 07/13/2021
Corrections:


Miscellaneous/Other
Comment Only
07/13/2021
Site visit, footings are not ready for inspection, rebar to be placed prior to inspection.

Miscellaneous/Other
Comment Only
07/13/2021
Site visit, footings are not ready for inspection, rebar to be placed prior to inspection.

Footing Inspection Partial Pass 7/14/2021 (10:00 - 12:00) 7/14/2021 (AM) 07/14/2021
Corrections:


Miscellaneous/Other
Comment Only
07/14/2021
Footings and rebar, grid G, lines 5 to 16… approved for concrete placement.

Footing Inspection Partial Pass 08/17/2021
Corrections:


Miscellaneous/Other
Comment Only
08/17/2021
3 piers on line 12, grids F.7,E, and E.4 Last small section of wall at dock area.

Footing Inspection Partial Pass 8/19/2021 (7:00 - 8:00) 8/19/2021 (AM) 08/19/2021
Corrections:


Miscellaneous/Other
Comment Only
08/19/2021
Pad footing on line 7.1, grid F Retaining wall footings off grid”A”, lines 2.7,3, and 6.3 Approved for concrete placement

Progress Inspection Partial Pass 11/23/2021 (2:30 - 3:30) 11/23/2021 (PM) 11/23/2021
Vapor Barrier Inspection
Corrections:


Miscellaneous/Other
Comment Only
11/23/2021
Under slab poly at remainder of mezzanine area… approved

Progress Inspection Partial Pass 12/15/2021 (2:30 - 3:30) 12/15/2021 (PM) 12/15/2021
Corrections:


Miscellaneous/Other
Comment Only
12/15/2021
Under slab poly at south end of building complete to the west end of building… approved

Framing Inspection Partial Pass 12/20/2021 (12:30 - 2:30) 12/20/2021 (PM) 12/20/2021
Corrections:


Miscellaneous/Other
Comment Only
12/20/2021
Mezzanine level framing of walls. … Approved South entry’s framing…approved Under slab Poly at north east section of building… approved

Progress Inspection Partial Pass 12/27/2021 (10:00 - 12:00) 12/27/2021 (AM) 12/27/2021
Corrections:


Miscellaneous/Other
Comment Only
12/27/2021
This section of under slab poly approved… ok to place concrete.

Framing Inspection Partial Pass 1/3/2022 (10:00 - 12:00) 1/3/2022 (AM) 01/03/2022
Corrections:


Miscellaneous/Other
Comment Only
01/03/2022
Hard lid / soffit framing on mezzanine level… approved

Framing Inspection Partial Pass 1/11/2022 (12:30 - 2:30) 1/11/2022 (PM) 01/11/2022
Corrections:


Miscellaneous/Other
Comment Only
01/11/2022
1st floor framing at mezzanine… approved

Framing Inspection Partial Pass 1/31/2022 (8:00 - 10:00) 1/31/2022 (AM) 01/31/2022
Corrections:


Miscellaneous/Other
Comment Only
01/31/2022
Framing of rooms in area E…. Approved

Framing Inspection Partial Pass 2/11/2022 (8:00 - 10:00) 2/11/2022 (AM) 02/11/2022
Corrections:


Miscellaneous/Other
Comment Only
02/11/2022
Framing at south entry and bathrooms… approved. Trades and sprinkler inspections needed prior to covering ceiling.

Above Ceiling Inspection Passed 03/02/2022
Corrections:


Miscellaneous/Other
Comment Only
03/02/2022
Above ceiling and ceiling framing at mezzanine areas… approved. Leave open some tiles for sprinkler inspection.

Progress Inspection Partial Pass 3/11/2022 (8:00 - 10:00) 3/11/2022 (AM) 03/11/2022
Above Ceiling Inspection
Corrections:


Miscellaneous/Other
Comment Only
03/11/2022
First level above ceiling and ceiling framing… approved, pending the correction o the exposed non plenum rated insulation in the lab rooms being covered or switched out with approved plenum rated materials.

Progress Inspection Partial Pass 5/16/2022 (8:00 - 10:00) 5/16/2022 (AM) 05/16/2022
Corrections:


Miscellaneous/Other
Comment Only
05/16/2022
Went through building and checked accessibility too bathrooms mothers room, and kitchens… approved Note… cane rail to still be installed at east stair. Exiting appears compliant. Note… when shelving is installed, exiting to be reevaluated.

Building Final Inspection Partial Pass 5/27/2022 (8:00 - 10:00) 5/27/2022 (AM) 05/27/2022
Corrections:


Miscellaneous/Other
Carried Forward
07/15/2022
Additional exiting signage to be installed for final of this permit by final inspection. Parking lot to be completed with 2nd lift of asphalt and striping. Landscaping to be completed for final.

Miscellaneous/Other
Comment Only
05/27/2022
Approved for TCO (temporary occupancy). See outstanding comments for final inspection requirements.

Fire Inspection Final Partial Pass 5/27/2022 (8:00 - 10:00) 5/27/2022 (AM) 06/02/2022
Lighting Inspection Passed 07/09/2022
SICK lighting
Building Final Inspection Partial Pass 7/15/2022 (8:00 - 10:00) 7/15/2022 (AM) 07/15/2022
Corrections:


Miscellaneous/Other
Comment Only
07/15/2022
Building is compliant to code and will remain on temp co. Items pending to complete final… 1) landscape inspection to be performed by city 2) electronic asbuilts to be sent to city engineering dept. 3) fire final to be completed and sprinkler heads to be installed in the sound proof stand alone cube rooms.

Fire Inspection Final Partial Pass 7/15/2022 (8:00 - 10:00) 7/15/2022 (AM) 07/20/2022
Landscaping Inspection Passed 8/29/2022 08/24/2022
Building Final Inspection Issue CO 8/25/2022 (10:00 - 12:00) 8/25/2022 (AM) 08/25/2022
Corrections:


Miscellaneous/Other
Resolved
08/25/2022
Additional exiting signage to be installed for final of this permit by final inspection. Parking lot to be completed with 2nd lift of asphalt and striping. Landscaping to be completed for final.

Miscellaneous/Other
Comment Only
08/25/2022
All outstanding items are resolved. The 3 sound proof pods have been removed and this eliminates the fire inspection requirement for sprinkler coverage to those pods. Final for this building and permit is approved, pending fire inspection final approval.

Fire Inspection Final Passed 8/25/2022 (10:00 - 12:00) 8/25/2022 (AM) 08/29/2022