PRBD202105164
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Framing Inspection | Passed | 7/20/2021 (10:00 - 12:00) | 7/20/2021 (AM) | 07/20/2021 |
Corrections:
Miscellaneous/Other
Comment Only
07/20/2021
Framing approved contingent on electrical rough in approval.
|
||||
Building Final Inspection | Partial Pass | 8/23/2021 (8:00 - 10:00) | 8/23/2021 (AM) | 08/23/2021 |
See corrections. | ||||
Corrections:
Miscellaneous/Other
Carried Forward
08/23/2021
Elevator remodel. A.No permit card on site. B Work covered with out inspections.
C. Electrical ceiling lites - must be rated. Above ceiling inspections for fire sprinkler rough in, and low voltage wiring inspection. D. Remove paint from rated exit door into stairwell. E. Provide exit sign to stairwell with rated door.
F. Emergency lighting required to building generator circuit. G. Building permit card must be posted in elevator lobby.
|
||||
Fire Inspection Final | Passed | 8/23/2021 (8:00 - 10:00) | 8/23/2021 (AM) | 08/26/2021 |
Fire Rated Assemblies Inspection | Passed | 11/15/2021 | ||
Building Final Inspection | Passed w/ Conditions | 11/15/2021 | ||
Final 3rd floor spec suite. Emergency lighting was to be on the building generator circuit. | ||||
Corrections:
Miscellaneous/Other
Outstanding
08/23/2021
Elevator remodel. A.No permit card on site. B Work covered with out inspections.
C. Electrical ceiling lites - must be rated. Above ceiling inspections for fire sprinkler rough in, and low voltage wiring inspection. D. Remove paint from rated exit door into stairwell. E. Provide exit sign to stairwell with rated door.
F. Emergency lighting required to building generator circuit. G. Building permit card must be posted in elevator lobby.
|