PRBD202105165
Building
Finaled
GKII NORTHLAND CENTER LLC
Alteration/Repair/Replace
Not Required
Replace finishes throughout corridors and elevator lobby including new gyp ceiling in elevator lobby - 4th floor corridor
05/04/2021
05/26/2021
05/14/2022
11/15/2021

Locations

Permits

Permit Number: PRBD202105165

Building
Finaled
05/26/2021
05/14/2022

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Framing Inspection Passed 7/20/2021 (10:00 - 12:00) 7/20/2021 (AM) 07/20/2021
Corrections:


Miscellaneous/Other
Comment Only
07/20/2021
Framing approved contingent on electrical rough in approval.

Fire Rated Assemblies Inspection Partial Pass 08/23/2021
Rated door with closer to stairwell. A. door rating label on door was painted, remove paint from label. Work completed and covered, with out rough in inspection. B. No permit card on site.
Corrections:


Miscellaneous/Other
Carried Forward
08/23/2021
Elevator lobby remodel. A. No permit card on site. B. Work covered with out inspections. C. Electrical ceiling lights - must be rated. Above ceiling inspections for fire sprinkler rough in, and low voltage wiring inspection are required. D. Remove paint from rated exit door into stairwell. E. Provide exit sign into stairwell with rated door. F. Emergency lighting required to building generator circuit. G. Building permit card must be posted in elevator lobby.

Building Final Inspection Partial Pass 8/23/2021 (8:00 - 10:00) 8/23/2021 (AM) 08/23/2021
See corrections.
Corrections:


Miscellaneous/Other
Carried Forward
08/23/2021
Elevator lobby remodel. A. No permit card On site. B. Work covered with inspections. C. Electrical ceiling lights - must be rated. Above ceiling inspections for fire sprinkler rough in, and low voltage wiring inspection are required. D. Remove paint from rated exit door into stairwell. E. Provide exit sign into stairwell with rated door. F. Emergency lighting required to building generator circuit. G. Building permit card must be posted in elevator lobby.

Fire Inspection Final Passed 8/23/2021 (8:00 - 10:00) 8/23/2021 (AM) 08/26/2021
Fire Rated Assemblies Inspection Passed 11/15/2021
Work completed.
Corrections:


Miscellaneous/Other
Outstanding
08/23/2021
Elevator lobby remodel. A. No permit card on site. B. Work covered with out inspections. C. Electrical ceiling lights - must be rated. Above ceiling inspections for fire sprinkler rough in, and low voltage wiring inspection are required. D. Remove paint from rated exit door into stairwell. E. Provide exit sign into stairwell with rated door. F. Emergency lighting required to building generator circuit. G. Building permit card must be posted in elevator lobby.

Building Final Inspection Passed 11/15/2021
Corrections:


Miscellaneous/Other
Outstanding
08/23/2021
Elevator lobby remodel. A. No permit card On site. B. Work covered with inspections. C. Electrical ceiling lights - must be rated. Above ceiling inspections for fire sprinkler rough in, and low voltage wiring inspection are required. D. Remove paint from rated exit door into stairwell. E. Provide exit sign into stairwell with rated door. F. Emergency lighting required to building generator circuit. G. Building permit card must be posted in elevator lobby.