PRBD202105165
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Framing Inspection | Passed | 7/20/2021 (10:00 - 12:00) | 7/20/2021 (AM) | 07/20/2021 |
Corrections:
Miscellaneous/Other
Comment Only
07/20/2021
Framing approved contingent on electrical rough in approval.
|
||||
Fire Rated Assemblies Inspection | Partial Pass | 08/23/2021 | ||
Rated door with closer to stairwell. A. door rating label on door was painted, remove paint from label. Work completed and covered, with out rough in inspection. B. No permit card on site. | ||||
Corrections:
Miscellaneous/Other
Carried Forward
08/23/2021
Elevator lobby remodel. A. No permit card on site. B. Work covered with out inspections. C. Electrical ceiling lights - must be rated. Above ceiling inspections for fire sprinkler rough in, and low voltage wiring inspection are required. D. Remove paint from rated exit door into stairwell. E. Provide exit sign into stairwell with rated door. F. Emergency lighting required to building generator circuit. G. Building permit card must be posted in elevator lobby.
|
||||
Building Final Inspection | Partial Pass | 8/23/2021 (8:00 - 10:00) | 8/23/2021 (AM) | 08/23/2021 |
See corrections. | ||||
Corrections:
Miscellaneous/Other
Carried Forward
08/23/2021
Elevator lobby remodel. A. No permit card On site. B. Work covered with inspections. C. Electrical ceiling lights - must be rated. Above ceiling inspections for fire sprinkler rough in, and low voltage wiring inspection are required. D. Remove paint from rated exit door into stairwell. E. Provide exit sign into stairwell with rated door. F. Emergency lighting required to building generator circuit.
G. Building permit card must be posted in elevator lobby.
|
||||
Fire Inspection Final | Passed | 8/23/2021 (8:00 - 10:00) | 8/23/2021 (AM) | 08/26/2021 |
Fire Rated Assemblies Inspection | Passed | 11/15/2021 | ||
Work completed. | ||||
Corrections:
Miscellaneous/Other
Outstanding
08/23/2021
Elevator lobby remodel. A. No permit card on site. B. Work covered with out inspections. C. Electrical ceiling lights - must be rated. Above ceiling inspections for fire sprinkler rough in, and low voltage wiring inspection are required. D. Remove paint from rated exit door into stairwell. E. Provide exit sign into stairwell with rated door. F. Emergency lighting required to building generator circuit. G. Building permit card must be posted in elevator lobby.
|
||||
Building Final Inspection | Passed | 11/15/2021 | ||
Corrections:
Miscellaneous/Other
Outstanding
08/23/2021
Elevator lobby remodel. A. No permit card On site. B. Work covered with inspections. C. Electrical ceiling lights - must be rated. Above ceiling inspections for fire sprinkler rough in, and low voltage wiring inspection are required. D. Remove paint from rated exit door into stairwell. E. Provide exit sign into stairwell with rated door. F. Emergency lighting required to building generator circuit.
G. Building permit card must be posted in elevator lobby.
|