Permit Application Status

PRBD202109804


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRBD202109804
Building
Finaled
KUBES BENJAMIN F TRUST
Alteration/Repair/Replace
Not Required
Replace siding around windows, replace 102 windows with new construction style windows, replace 21 patio doors. No change to patio doors, same size. No electrical around windows. 25 Squares of siding for entire project, removing, vinyl siding. No HOA Required.
07/28/2021
08/02/2021
06/12/2023
12/14/2022

Locations

Permits

Permit Number: PRBD202109804

Building
Finaled
08/02/2021
06/12/2023

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Framing Inspection Partial Pass 11/22/2021 (8:00 - 10:00) 11/22/2021 (AM) 11/22/2021
On going work. Ok to proceed. A. New windows will have new vinyl siding around window area, and a new top head metal drip cap. B. All inverted or upside down vinyl siding J channel installed above new windows must have a 3/16 inch minimum drain holes spaced a maximum of 20 - 24 inches, with a large amount of end dam caulking. C. Ok to proceed with installing new windows. C. All living units have a thru wall window air conditioner, providing some additional exterior make up into the living unit.
Housewrap Inspection Partial Pass 11/22/2021
HOUSEWRAP - Ongoing work. A. Contractor is OK to proceed with out additional city House wrap inspections, or additional framing inspection.
Corrections:


Miscellaneous/Other
Outstanding
11/22/2021
Framing - contractor can proceed with out a city inspection for framing inspections.

Progress Inspection Partial Pass 3/10/2022 (10:00 - 12:00) 3/10/2022 (AM) 03/10/2022
See corrections.
Corrections:


Miscellaneous/Other
Comment Only
03/10/2022
Project description - A. Install new exterior replacement windows and vinyl exterior siding around the windows in the living units and tempered windows in the stairwells. B. Work performed to date - passed. C. 6 windows are back ordered, due to window manufacture plant destroyed in recent Iowa tornado. D. Smoke and CO detectors being installed by owner maintenance manager. E. City is issuing a partial final on 95% completion of work.

Building Final Inspection Passed 12/14/2022 (12:30 - 2:30) 12/14/2022 (PM) 12/14/2022
Fire Inspection Final Passed 12/14/2022 (12:30 - 2:30) 12/14/2022 (PM) 12/14/2022