PRBD202111128
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Framing Inspection | Passed | 9/28/2021 (2:30 - 3:30) | 9/28/2021 (PM) | 09/28/2021 |
Framing Inspection | Partial Pass | 6/1/2022 (2:30 - 3:30) | 6/1/2022 (PM) | 06/01/2022 |
Structural header, removing part or existing kitchen load bearing wall. Passed. Phase 1 of 2. Note phase 2, installing large kitchen window in exterior kitchen wall. | ||||
Building Final Inspection | Partial Pass | 12/11/2023 (2:30 - 3:30) | 12/11/2023 (PM) | 12/11/2023 |
New gas range, requires to install the anti tip brackets. |