Permit Application Status

PRBD202111709


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRBD202111709
Building
Finaled
MOAC MALL HOLDINGS LLC
Alteration/Repair/Replace
Not Required
Remodel of an existing tenant space in the Mall of America for a new Ridemakerz store.
09/02/2021
10/15/2021
06/18/2022
12/20/2021

Locations

Permits

Permit Number: PRBD202111709

Building
Finaled
10/15/2021
06/18/2022

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Framing Inspection Partial Pass 11/4/2021 (8:00 - 10:00) 11/4/2021 (AM) 11/04/2021
Corrections:


Miscellaneous/Other
Comment Only
11/04/2021
Wall framing approved, contractor to provide photos of fire stops at floor penetrations. Possible change in ceiling may require a separate bulkhead to be installed, inquire with inspector if this change happens.

Progress Inspection Passed w/ Conditions 12/7/2021 (8:00 - 10:00) 12/7/2021 (AM) 12/07/2021
Corrections:


Miscellaneous/Other
Comment Only
12/07/2021
Above ceiling and ceiling framing approved… install access panel for fire damper located in bathroom.

Fire Inspection Final Passed 12/16/2021
Building Final Inspection Partial Pass 12/16/2021 (8:00 - 10:00) 12/16/2021 (AM) 12/16/2021
Corrections:


Miscellaneous/Other
Comment Only
12/16/2021
Approved for stock and training once space is cleaned. Call for final once all work and trades inspections are completed.

Building Final Inspection Passed 12/20/2021 (8:00 - 10:00) 12/20/2021 (AM) 12/20/2021
Corrections:


Miscellaneous/Other
Comment Only
12/20/2021
Final for this permit approved, ok to open to public.