PRBD202114954
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Framing Inspection | Partial Pass | 1/11/2022 (12:30 - 2:30) | 1/11/2022 (PM) | 01/11/2022 |
Corrections:
Miscellaneous/Other
Comment Only
01/11/2022
Wall framing and fire stops…. Approved
Exposed structural steel needs to be fire proofed and protected. Special inspection will be needed and city inspections.
|
||||
Framing Inspection | Partial Pass | 01/26/2022 | ||
Corrections:
Miscellaneous/Other
Comment Only
01/26/2022
Viewed the fireproofing at the structural steel that was stripped off and re- fireproofed. Cafco 300 was used and trowel patched to approx a consistent 1 1/4” depth and at the top and bottom of beam , and packed full at the “I” beam centers.
Approved, and ok to cover when fireproofing dries.
|
||||
Building Final Inspection | Passed w/ Conditions | 4/28/2022 (10:00 - 12:00) | 4/28/2022 (AM) | 04/28/2022 |
Corrections:
Miscellaneous/Other
Comment Only
04/28/2022
Final approved, pending electrical final.
|
||||
Fire Inspection Final | Passed | 4/28/2022 (10:00 - 12:00) | 4/28/2022 (AM) | 04/28/2022 |