Permit Application Status

PRBD202115161


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRBD202115161
Building
Expired
RWIC OFFICE PARTNERSHIP
Alteration/Repair/Replace
Not Required
New Tenant Space in existing office building. New offices, conference room, and reception area.
11/12/2021
11/29/2021
07/05/2022

Locations

Permits

Permit Number: PRBD202115161

Building
Expired
11/29/2021
07/05/2022

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Fire Inspection Final Pending
Building Final Inspection Pending
Framing Inspection Passed w/ Conditions 12/14/2021 (2:30 - 3:30) 12/14/2021 (PM) 12/14/2021
Inspector notes. Framing - approved for new partition interior walls, passed. CORRECTIONS required. A. Patch existing spray applied fireproofing on steel I beam, in new space. using Cafco Brand hand patch. B. Sheetrock 2 layers of 5/8 inch for existing steel structural column in new space, ( and the steel column in the south neighboring vacant future tenant space. C. EXISTING Horn strobe fire alarm In corridors. D. 45 MINUTE RATED TENANT DOORS REQUIRES DOOR CLOSERS. E. CALL FOR STEEL BEAM FIREPROOFING PATCHING AND GYPSUM FIRE PROOF AT COLUMNS
Corrections:


Miscellaneous/Other
Comment Only
12/14/2021
Existing vacant space. A. Call for fireproof patching of existing steel beam, using hand patch fireproofing. B The existing steel column in the demolitioned neighboring space requires 2 layers of 5/8 inch gypsum.

Framing Inspection Passed w/ Conditions 1/6/2022 (8:00 - 10:00) 1/6/2022 (AM) 01/06/2022
Corrections:


Miscellaneous/Other
Comment Only
01/06/2022
Confirmed two layers of sheet rock on structural column as requested on framing inspection, OK. Patch exposed steel above ceiling with fire proofing as required.