PRBD202116310
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Framing Inspection | Passed w/ Conditions | 1/28/2022 (8:00 - 10:00) | 1/28/2022 (AM) | 01/28/2022 |
Framing - passed. A. 5 - Ceiling strobes for conference rooms. B. 5 core drill for concrete floor electrical under tables. C. Above ceiling supports for tempered glass wall and doors. Call for all trade rough in inspections for walls and above ceiling. | ||||
Building Final Inspection | Passed | 4/19/2022 (8:00 - 10:00) | 4/19/2022 (AM) | 04/19/2022 |
Fire Inspection Final | Passed | 4/19/2022 (8:00 - 10:00) | 4/19/2022 (AM) | 04/20/2022 |