Summary

PRBD202116687
Building
Finaled
MOAC MALL HOLDINGS LLC
Alteration/Repair/Replace
Not Required
DEMOLISH EXISTING INTERIOR RETAIL TENANT SPACE INCLUDING BUT NOT LIMITED TO ELECTRICAL, PLUMBING, INTERIOR WALLS, CEILING, AND FLOORING WHILE NOT DISTURBING EXISTING LANDLORD NEUTRAL PIERS, BULKHEAD, STRUCTURE, ETC. SEE PLANS FOR SPECIFIC SCOPE OF DEMOLITION. TENANT IMPROVEMENTS WILL CONSIST OF NEW ELECTRICAL (INCLUDING LIGHTING), PLUMBING FIXTURES, INTERIOR WALLS, CEILINGS, AND FLOORING. EXISTING TOILET ROOM WILL BE REFINISHED AND REWORKED TO MEET CURRENT CODES INCLUDING BUT NOT LIMITED TO ADA.
12/23/2021
01/19/2022
12/12/2022
06/15/2022

Locations

Permits

Permit Number: PRBD202116687

Building
Finaled
01/19/2022
12/12/2022

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Framing Inspection Partial Pass 2/23/2022 (8:00 - 10:00) 2/23/2022 (AM) 02/23/2022
Corrections:


Miscellaneous/Other
Comment Only
02/23/2022
Wall framing approved

Framing Inspection Passed w/ Conditions 3/1/2022 (8:00 - 10:00) 3/1/2022 (AM) 03/01/2022
Corrections:


Miscellaneous/Other
Comment Only
03/01/2022
Above ceiling and ceiling framing approved pending… corrections at mall smoke bulkhead and photos of corrections, and photos of the bulkhead covering before wood or finishes are applied, and inspections by hvac and fire prior to covering ceilings in the space. Call for the inspections when trades are ready.

Building Final Inspection Partial Pass 6/14/2022 (8:00 - 10:00) 6/14/2022 (AM) 06/14/2022
Corrections:


Miscellaneous/Other
Carried Forward
06/14/2022
1) cabinet over toilet to be relocated to opposite wall, cannot have this in this location per accessibility requirements. 2) install accessibility signage to bathroom. 3) relocate exit signage in storage room to above the BOH exit door. 4) install suite numbers to rear exit 5) complete misc work and clean space. Reschedule final inspection when all is completed.

Miscellaneous/Other
Comment Only
06/14/2022
Approved to stock. See outstanding comments for correction, reschedule final inspection when all is completed.

Fire Inspection Final Partial Pass 6/14/2022 (8:00 - 10:00) 6/14/2022 (AM) 06/14/2022
Building Final Inspection Passed 6/15/2022 (10:00 - 12:00) 6/15/2022 (AM) 06/15/2022
Corrections:


Miscellaneous/Other
Resolved
06/15/2022
1) cabinet over toilet to be relocated to opposite wall, cannot have this in this location per accessibility requirements. 2) install accessibility signage to bathroom. 3) relocate exit signage in storage room to above the BOH exit door. 4) install suite numbers to rear exit 5) complete misc work and clean space. Reschedule final inspection when all is completed.

Miscellaneous/Other
Comment Only
06/15/2022
Final approved, ok to open to public… pending fire inspection final.

Fire Inspection Final Passed 6/15/2022 (10:00 - 12:00) 6/15/2022 (AM) 06/15/2022