PRBD202200216
Building
Finaled
KRAUS-ANDERSON INC
Alteration/Repair/Replace
Not Required
A limited remodeling of approximately 2,500sf within the center core area of the sales floor. Work involves selective demolition of the flooring, ceiling, and fixture walls within this center core area. New ceilings, lighting, and flooring will be installed along with partial height fixture walls. Shallow trenching of the floor slab will be required to accommodate new in-slab electrical receptacles. No plumbing, mech/HVAC, or site changes.
01/07/2022
02/25/2022
12/14/2022
06/17/2022

Locations

Permits

Permit Number: PRBD202200216

Building
Finaled

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Framing Inspection Passed w/ Conditions 6/7/2022 (12:30 - 2:30) 6/7/2022 (PM) 06/07/2022
All Framing is completed. Passed with conditions to call for all trade inspections. Fire sprinkler, Electrical, electrical low voltage, HVAC mechanical.
Corrections:


Miscellaneous/Other
Comment Only
06/07/2022
METAL STUD FRAMING, FRT PLYWOOD, 48 INCH TALL SQUARE STEEL BOLTED TO EXISTING CONCRETE FLOOR, TO SUPPORT STEEL STUD WALLS. PASSED WITH CONDITIONS TO CALL FOR ALL TRADE ROUGH IN INSPECTIONS. ( electrical, hvac, low voltage electrical, fire sprinkler rough in’s.) Cash wrap drawing provided on plan set.

Building Final Inspection Passed 6/17/2022 (8:00 - 10:00) 6/17/2022 (AM) 06/17/2022
Corrections:


Miscellaneous/Other
Comment Only
06/17/2022
Final approved

Fire Inspection Final Passed 6/17/2022 (8:00 - 10:00) 6/17/2022 (AM) 06/17/2022