Permit Application Status

PRBD202200263


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRBD202200263
Building
Finaled
MOAC MALL HOLDINGS LLC
Alteration/Repair/Replace
Not Required
Construction of the required landlord work (hallway & restroom sets). This portion of the work was designed by MOA and construction will be managed by MOA (GC).
01/10/2022
01/31/2022
01/21/2023
07/25/2022

Locations

Permits

Permit Number: PRBD202200263

Building
Finaled
01/31/2022
01/21/2023

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Framing Inspection Passed w/ Conditions 3/15/2022 (8:00 - 10:00) 3/15/2022 (AM) 03/15/2022
Corrections:


Miscellaneous/Other
Comment Only
03/15/2022
Corridor and bathrooms wall framing approved , pending fire stops at the 4 plumbing floor penetrations and filling the empty cored hole in floor. … plumbing inspector to verify at inspection.

Framing Inspection Partial Pass 4/21/2022 (8:00 - 10:00) 4/21/2022 (AM) 04/21/2022
Corrections:


Miscellaneous/Other
Comment Only
04/21/2022
Elevator lobby ceiling framing and above ceiling… approved, pending electrical inspection. No covering till electrical inspection is approved. Call for soffit and bathroom ceilings framing when completed.

Framing Inspection Passed 4/26/2022 (12:30 - 2:30) 4/26/2022 (PM) 04/26/2022
Corrections:


Miscellaneous/Other
Comment Only
04/26/2022
Ceiling framing and above ceiling in both bathrooms approved. Access panel with fire treated plywood on framing will be installed as walkway and access to j boxes, valves and dampers, etc… above ceiling… Approved.

Progress Inspection Passed 5/11/2022 (8:00 - 10:00) 5/11/2022 (AM) 05/11/2022
Corrections:


Miscellaneous/Other
Comment Only
05/11/2022
Above ceiling and ceiling framing approved for corridor.

Building Final Inspection Failed 5/13/2022 (10:00 - 12:00) 5/13/2022 (AM) 05/13/2022
Corrections:


Miscellaneous/Other
Carried Forward
05/13/2022
1) New Bathrooms that are built require Ambulatory stalls in each bathroom group. See approved city plans with the stamp stating the requirements for bathrooms. Doors must swig outward, and stalls to be 36” min. with the required grab bars installed to stalls. 2) install approved accessibility compliant signage to the bathrooms.

Fire Inspection Final Passed 7/25/2022 (8:00 - 10:00) 7/25/2022 (AM) 07/25/2022
Building Final Inspection Passed 7/25/2022 (8:00 - 10:00) 7/25/2022 (AM) 07/25/2022
Corrections:


Miscellaneous/Other
Resolved
07/25/2022
1) New Bathrooms that are built require Ambulatory stalls in each bathroom group. See approved city plans with the stamp stating the requirements for bathrooms. Doors must swig outward, and stalls to be 36” min. with the required grab bars installed to stalls. 2) install approved accessibility compliant signage to the bathrooms.

Miscellaneous/Other
Comment Only
07/25/2022
Accessibility is compliant, final for this permit and scope of work… approved