PRBD202202452
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Framing Inspection | Passed w/ Conditions | 6/8/2022 (8:00 - 10:00) | 6/8/2022 (AM) | 06/08/2022 |
Corrections:
Miscellaneous/Other
Comment Only
06/08/2022
Wall framing approved and pending electrical inspection.
Openings in walls cut for pass through access, verbal to contractor to install kicker supports from unsupported framing to ceiling above at each opening… these are to be visible o see at the next inspection.
|
||||
Building Final Inspection | Failed | 7/7/2022 (12:30 - 2:30) | 7/7/2022 (PM) | 07/07/2022 |
Corrections:
Miscellaneous/Other
Carried Forward
07/07/2022
1) Sprinkler permit and heads relocation and installation required.
2) Storage shelves to be lowered to have minimum clearance from ceiling of 18”.
Final and/or temporary occupancy … NOT APPROVED
|
||||
Progress Inspection | Passed w/ Conditions | 07/07/2022 | ||
Corrections:
Miscellaneous/Other
Comment Only
07/07/2022
Will allow the stocking of goods in this store, all goods must maintain 18” clearance from ceiling and sprinkler heads, the shelves along the sales / storeroom demising wall are not to be stocked at this time to allow sprinkler work to be done.
|
||||
Fire Inspection Final | Failed | 7/7/2022 (12:30 - 2:30) | 7/7/2022 (PM) | 07/08/2022 |
Building Final Inspection | Passed | 7/14/2022 (8:00 - 10:00) | 7/14/2022 (AM) | 07/14/2022 |
Corrections:
Miscellaneous/Other
Resolved
07/14/2022
1) Sprinkler permit and heads relocation and installation required.
2) Storage shelves to be lowered to have minimum clearance from ceiling of 18”.
Final and/or temporary occupancy … NOT APPROVED
|
||||
Miscellaneous/Other
Comment Only
07/14/2022
Sprinkler coverage corrected.
Final for this permit approved.
|
||||
Fire Inspection Final | Passed | 7/14/2022 (8:00 - 10:00) | 7/14/2022 (AM) | 07/14/2022 |