Permit Application Status

PRBD202202842


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRBD202202842
Building
Expired
NORTH PAD DEVELOPMENT LLC
Alteration/Repair/Replace
Not Required
252 North Garden, Bloomington MN 55425 INTERIOR COMMERCIAL ALTERATIONS TO AN EXISTING RETAIL SPACE - N252 IN MALL OF AMERICA. SCOPE OF WORK INCLUDES ARCHITECTURAL, MECHANICAL, AND ELECTRIC. THE SCOPE OF WORK DOES NOT INCLUDE PLUMBING.
03/22/2022
07/07/2022
05/15/2023

Locations

Property
0102724240013

252 North Garden, Bloomington MN 55425

Permits

Permit Number: PRBD202202842

Building
Expired
07/07/2022
05/15/2023

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Fire Inspection Final Pending
Building Final Inspection Pending
Corrections:


Miscellaneous/Other
Outstanding
11/15/2022
1) correcting exit signs as discussed at inspection. 2) provide plan for sprinkler Change out Modification timeline over the climbing walls. 3) seal openings in exit corridor.

Framing Inspection Partial Pass 7/26/2022 (2:30 - 3:30) 7/27/2022 (PM) 07/26/2022
Corrections:


Miscellaneous/Other
Comment Only
07/26/2022
Knee wall framing in the climb wall area, and interior and storefront walls of space … framing and fire stops approved, and ok to cover pending trades inspections.

Framing Inspection Passed 08/03/2022
Corrections:


Miscellaneous/Other
Comment Only
08/03/2022
Above ceiling and hard lid framing … approved, and pending trades inspections prior to covering.

Above Ceiling Inspection Passed 9/7/2022 (8:00 - 10:00) 9/7/2022 (AM) 09/07/2022
Corrections:


Miscellaneous/Other
Comment Only
09/07/2022
Above ceiling approved, ok to pad out ceilings

Building Final Inspection Partial Pass 11/15/2022 (8:00 - 10:00) 11/15/2022 (AM) 11/15/2022
Corrections:


Miscellaneous/Other
Carried Forward
11/15/2022
1) correcting exit signs as discussed at inspection. 2) provide plan for sprinkler Change out Modification timeline over the climbing walls. 3) seal openings in exit corridor.

Miscellaneous/Other
Comment Only
11/15/2022
Approved for temp occupancy pending reinspection of the outstanding items listed prior to opening.

Fire Inspection Final Partial Pass 11/15/2022 (8:00 - 10:00) 11/15/2022 (AM) 11/16/2022