PRBD202205068
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Framing Inspection | Passed w/ Conditions | 7/25/2022 (10:00 - 12:00) | 7/25/2022 (AM) | 07/25/2022 |
New dimising wall framing passed. | ||||
Corrections:
Miscellaneous/Other
Comment Only
07/26/2022
Wall framing viewed one side. Passed. A. Fire caulk or drywall patch all penetrations or holes above ceiling, in rated wall assemblies. B. Fill all round floor holes with 2 hour rated assemblies (using stucco mesh, and 1-2 pins, and fill with concrete, level with the existing concrete floors.
Call for rein-spection when completed, prior to installing new flooring or new carpet.
|
||||
Above Ceiling Inspection | Passed w/ Conditions | 8/15/2022 (8:00 - 10:00) | 8/15/2022 (AM) | 08/15/2022 |
Floor penetrations - filled. completed. | ||||
Corrections:
Miscellaneous/Other
Outstanding
08/15/2022
Provide all trade inspections above ceiling, for plumbing, electrical, low voltage, mechanical. A. OK TO PROCEED.
|
||||
Building Final Inspection | Issue TCO | 9/29/2022 (10:00 - 12:00) | 9/29/2022 (AM) | 09/29/2022 |
Electrical - open for furniture whip deck ordered. All other trade inspections passed. | ||||
Fire Inspection Final | Passed | 9/29/2022 (10:00 - 12:00) | 9/29/2022 (AM) | 09/30/2022 |
Building Final Inspection | Passed | 10/17/2022 (10:00 - 12:00) | 10/17/2022 (AM) | 10/17/2022 |