Summary

PRBD202205935
Building
Finaled
8200 HUMBOLDT CORPORATION
New
Residential, multiple family
Storage, low hazard
Demo of existing building (separate permit) and constructing a 149 unit apartment building.
05/25/2022
10/12/2022
04/06/2025

Locations

Permits

Permit Number: PRBD202205935

Building
Finaled
10/12/2022
04/06/2025

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Framing Inspection Partial Pass 1/27/2023 (8:00 - 10:00) 1/27/2023 (AM) 01/27/2023
Start of framing first layer interior - stairwell. Take photos. North to south. A. Missing nails In exterior sheeting 6 inch on center each way: north side and similar areas having deep trench needing backfill.
Progress Inspection Partial Pass 1/31/2023 (10:00 - 12:00) 1/31/2023 (AM) 01/31/2023
Site meeting. Framing for 1 hour rated exterior walls. Exterior sheeting and nail pattern 7-d nails spaced 7 inch max vertical. Type of exterior sheeting e-XP.
Framing Inspection Partial Pass 02/07/2023
Progress framing inspection.
Progress Inspection Passed 2/13/2023 (8:00 - 10:00) 2/13/2023 (AM) 02/13/2023
A. Progress Inspection: exterior gypsum sheeting. Screw length 1-1/4 inch course thread, spacing 6 inch on center. B. Exterior grade 5/8 inch gypsum sheeting and some 1/2 inch exterior OSB sheeting, for exterior sheer wall per plan, nailed per plan specifications. C. City inspector requests one complete set of blueprints, current plans, size 24 inch x 36 inch for field inspections.
Progress Inspection Partial Pass 2/27/2023 (12:30 - 2:30) 2/27/2023 (PM) 02/27/2023
Ongoing framing and nail pattern for all exterior sheathing .
Progress Inspection Partial Pass 3/6/2023 (8:00 - 10:00) 3/6/2023 (AM) 03/06/2023
On going framing inspections. A. Working from north end of building to south end of building. Pass.
Progress Inspection Partial Pass 3/10/2023 (10:00 - 12:00) 3/10/2023 (AM) 03/10/2023
Floor 2, second layer gypsum and screw pattern in stairwell.
Corrections:


Miscellaneous/Other
Comment Only
03/10/2023
Progress for 2nd layer gypsum and fastner in stairwell. Partial pass as ongoing inspections.

Progress Inspection Passed 3/15/2023 (8:00 - 10:00) 3/15/2023 (AM) 03/15/2023
Progress Inspection Partial Pass 3/16/2023 (10:00 - 12:00) 3/16/2023 (AM) 03/16/2023
3rd floor, second layer gypsum for stairwells. Passed. Ongoing.
Progress Inspection Partial Pass 3/21/2023 (12:30 - 2:30) 3/21/2023 (PM) 03/21/2023
Progress. A. Gypsum sheathing installation and screw fastener length for 2 layer, floor 3, elevator shaft. Passed. Ongoing inspections.
Progress Inspection Partial Pass 3/29/2023 (8:00 - 10:00) 3/29/2023 (AM) 03/29/2023
On going framing inspections, and 1st layer of 5/8 inch gypsum screw fastner pattern: 6 inch on center for 2 hour rated stairwell shafts.
Progress Inspection Partial Pass 4/3/2023 (12:30 - 2:30) 4/3/2023 (PM) 04/03/2023
Ongoing inspections.
Corrections:


Miscellaneous/Other
Carried Forward
04/03/2023
First layer of 1/2 inch fire rated gypsum, screw spacing 6 inch on center.

Progress Inspection Partial Pass 4/7/2023 (10:00 - 12:00) 4/7/2023 (AM) 04/07/2023
Gypsum stairwell 2 layers . First layer screw pattern south end .
Corrections:


Miscellaneous/Other
Carried Forward
04/07/2023
First layer of 1/2 inch fire rated gypsum, screw spacing 6 inch on center. 3

Framing Inspection Partial Pass 04/24/2023
Simpson strong tie, review specs and installation on site.
Framing Inspection Partial Pass 4/26/2023 (12:30 - 2:30) 4/26/2023 (PM) 04/27/2023
Progress
Housewrap Inspection Partial Pass 05/08/2023
Approx 1/3 of the building from the north - passed.
Progress Inspection Partial Pass 05/16/2023
Progress-framing and 2nd layer gypsum sheeting and nail spacing per plan.
Corrections:


Miscellaneous/Other
Carried Forward
05/16/2023
First layer of 1/2 inch fire rated gypsum, screw spacing 6 inch on center. 3

Framing Inspection Partial Pass 6/20/2023 (8:00 - 10:00) 6/20/2023 (AM) 06/20/2023
Framing: Ongoing inspections passed.
Corrections:


Miscellaneous/Other
Comment Only
06/20/2023
4th floor North, party walls between units. Passed.

Framing Inspection Partial Pass 6/22/2023 (12:30 - 2:30) 6/22/2023 (PM) 06/26/2023
4th floor unit framing and firecaulk: passed.
Framing Inspection Partial Pass 6/27/2023 (8:00 - 10:00) 6/27/2023 (AM) 06/27/2023
4th floor: Ongoing framing inspections and fire caulk inspections.
Insulation Inspection Passed w/ Conditions 6/30/2023 (8:00 - 10:00) 6/30/2023 (AM) 06/30/2023
4 th floor.
Corrections:


Miscellaneous/Other
Comment Only
06/30/2023
Forth floor: framing, insulation, fire-caulk, and oval cut all wood stud holes receiving horizontal pipes on the top side, (for building shrinkage.) Increase all wood stud oval top side holes incrementally for floors 3, 2, 1, for building shrinkage.

Progress Inspection Passed 7/5/2023 (7:00 - 8:00) 7/5/2023 (AM) 07/05/2023
Balance of 4th floor framing, fire caulking, insulation.
Corrections:


Miscellaneous/Other
Comment Only
07/05/2023
First layer of 5/8 inch fire rated gypsum, screw spacing 6 inch on center.

Progress Inspection Passed 7/13/2023 (8:00 - 10:00) 7/13/2023 (AM) 07/13/2023
A. Exterior inspection of building, and House-wrap. B. Underground parking ramp entrance height = 99.5 inch. C. Passed.
Progress Inspection Not Ready 7/14/2023 (12:30 - 2:30) 7/14/2023 (PM) 07/15/2023
Progress 3rd floor: Framing and firecaulk.
Progress Inspection Partial Pass 7/17/2023 (10:00 - 12:00) 7/17/2023 (AM) 07/17/2023
3rd floor Fire caulk inspection. A. Starting north to south end of building. B. Not ready as ceiling penetrations still required for mechanical, electrical, low voltage, plumbing, and fire Sprinkler.
Corrections:


Miscellaneous/Other
Outstanding
07/17/2023

Miscellaneous/Other
Comment Only
07/17/2023
Floor level 3, north to (south unit 321). 1. Above Ceiling penetrations missing. 2. Floor penetrations missing in some units. 3. Subcontractors need more time.

Progress Inspection Partial Pass 7/18/2023 (8:00 - 10:00) 7/18/2023 (AM) 07/18/2023
Trade inspections are not ready.
Corrections:


Miscellaneous/Other
Comment Only
07/18/2023
Third floor: Trade inspections are not completed with there work nor ready for there rough in inspections.

Insulation Inspection Partial Pass 7/20/2023 (10:00 - 12:00) 7/20/2023 (AM) 07/20/2023
3rd Floor walls.
Insulation Inspection Partial Pass 7/21/2023 (8:00 - 10:00) 7/21/2023 (AM) 07/21/2023
Date July 20, 2023. 3rd floor:ceiling & wall insulation, and sealed mechanical ductwork inside living units
Progress Inspection Partial Pass 8/3/2023 (12:30 - 2:30) 8/3/2023 (PM) 08/04/2023
3rd floor fire caulk and trade rough in. Not ready
Progress Inspection Passed 8/7/2023 (12:30 - 2:30) 8/7/2023 (PM) 08/07/2023
3rd floor, and 2nd floor framing and fire caulk. Progress.
Framing Inspection Partial Pass 7/11/2023 (Afternoon) 7/11/2023 (PM) 08/08/2023
4th floor flat roof framing for window washing anchors, framing with 3rd party special inspections. Passed.
Footing Inspection Partial Pass 08/08/2023
Ongoing work.
Insulation Inspection Partial Pass 8/10/2023 8/10/2023 (AM) 08/10/2023
(Ongoing insulation) -fiberglass walls: 1. Exterior walls, interior walls, progressing. 2. Please allow for mechanical rough in inspections, before insulating ceiling and walls. 3. Fire caulk penetrations by Enclave.
Progress Inspection Passed w/ Conditions 8/31/2023 (10:00 - 12:00) 8/31/2023 (AM) 08/31/2023
Fire rated, fire caulk assemblies. Progress.
Progress Inspection Passed w/ Conditions 9/5/2023 (8:00 - 10:00) 9/5/2023 (AM) 09/05/2023
Walk thru interior building inspection, after gypsum is installed. Ongoing.
Housewrap Inspection Passed w/ Conditions 09/08/2023
Ongoing
Progress Inspection Partial Pass 9/25/2023 (12:30 - 2:30) 9/25/2023 (PM) 09/25/2023
Progress inspection. Passed. Walk Thru.
Footing Inspection Not Ready 09/29/2023
Balance of footings to date. Need special inspection final summary report from American engineering and testing.
Progress Inspection Passed 10/16/2023 (Morning) 10/16/2023 (AM) 10/16/2023
Progress on interior units accessibility.
Progress Inspection Partial Pass 10/23/2023 (Morning) 10/23/2023 (AM) 10/23/2023
4th floor progress, and one hour fire rated self closing doors for smoke and draft at building fire rated corridor, 1 hr rated for fire separation at fire wall. Passed. Ongoing.
Progress Inspection Partial Pass 10/30/2023 (10:00 - 12:00) 10/30/2023 (AM) 10/30/2023
Window fall guard devices. A. Some windows missing (Fall Guard limiting protection.) Anderson brand windows, factory fall guard protection not installed T this time.
Progress Inspection Passed w/ Conditions 11/6/2023 (Morning) 11/6/2023 (AM) 11/06/2023
Progress inspection. Walk Thru.
Progress Inspection Passed 11/28/2023 (12:30 - 2:30) 11/28/2023 (PM) 11/28/2023
Consult for main floor restroom accessibility dimensions. Passed.
Progress Inspection Partial Pass 12/11/2023 (12:30 - 2:30) 12/11/2023 (PM) 12/11/2023
Walk thru and around new building, and exterior. No corrections at this time.
Lighting Inspection Passed 1/2/2024 12/30/2023
Parking lot lighting - Enclave
Framing Inspection Partial Pass 1/2/2024 (10:00 - 12:00) 1/2/2024 (AM) 01/02/2024
Corrections:


Miscellaneous/Other
Comment Only
01/02/2024
Framing of elevator front walls at floors 1-4 approved pending install of added studs along door frames for fastening of drywall, and filling in voids in bottom plates of wall framing.

Building Final Inspection Partial Pass 1/16/2024 (12:30 - 2:30) 1/16/2024 (PM) 01/16/2024
4 th floor. Interior
Corrections:


Miscellaneous/Other
Comment Only
01/16/2024
4th floor final. Partial pass.

Building Final Inspection Partial Pass 1/17/2024 (12:30 - 2:30) 1/17/2024 (PM) 01/17/2024
Building final inspection. Ongoing.
Corrections:


Miscellaneous/Other
Comment Only
01/17/2024
Building final inspection - ongoing.

Building Final Inspection Partial Pass 1/18/2024 (12:30 - 2:30) 1/18/2024 (PM) 01/18/2024
Progress to final. Building inspector. A. All room units and common storage units floors 1, 2, 3, 4. Passed. B. All exterior land scape and exterior building lighting. Passed.
Corrections:


Miscellaneous/Other
Comment Only
01/18/2024
Floors 1,2 3,4. All units and common storage units, passed.

Fire Inspection Final Partial Pass 01/19/2024
Building Final Inspection Not Ready 1/19/2024 (8:00 - 10:00) 1/19/2024 (AM) 01/19/2024
Fire Inspection Final Issue TCO 1/22/2024 (2:30 - 3:30) 1/22/2024 (PM) 01/23/2024
Sprinkler system and fire alarm system are approved and in service. Ok to bring in furniture. No residents at this time.
Fire Inspection Final Not Ready 1/22/2024 (10:00 - 12:00) 1/22/2024 (AM) 01/23/2024
Fire Inspection Final Partial Pass 1/26/2024 (8:00 - 10:00) 1/26/2024 (AM) 01/26/2024
Building address signs, unit hallway directional signs, lower exit signs in the garage, remove lockable door hardware garage level stairwells, turn hydrant,
Building Final Inspection Partial Pass 1/26/2024 (8:00 - 10:00) 1/26/2024 (AM) 01/26/2024
Corrections:


Miscellaneous/Other
Outstanding
01/26/2024
Corrections.... 1) complete firestops of through piping penetrations where missed in garage (2 pipes). 2) lower exit signs due to obstructed views, minimum heights to be 8ft where in the accessible drive lane and 7 ft for all others. 3) complete the misc setup of furnishingsand finishes on main level, and unit and building cleaning at other levels. 4) install guards at plaza as detailed on plans. ( guards are about 30 days out on delivery, call for final when all are completed). 5) install trapwrap at 4th floor accessory bathroom sink piping. 6) all permits for this project are to be final with inspections for the building final and full C of O. Call for final inspection when fully completed.

Miscellaneous/Other
Comment Only
01/26/2024
See outstanding comments for building final and full certificate of occupancy. This inspection will allow a Temp Occupancy for this building for 30 days, and reinspection to be set up and performed for outstanding items. Temp occupancy granted for this building, time frame is 30 days. Any additional time for this temp must be approved by the city inspector.

Fire Inspection Final Passed 2/23/2024 (8:00 - 10:00) 2/23/2024 (AM) 02/23/2024
Building Final Inspection Passed 2/23/2024 (10:00 - 12:00) 2/23/2024 (AM) 02/26/2024
Building final inspection.
Insulation Inspection VOID 02/26/2024
Progress Inspection VOID 04/05/2024
Framing Inspection VOID 04/05/2024
Footing Inspection VOID 04/05/2024
Building Final Inspection VOID 04/05/2024
EH Progress Inspection VOID 04/05/2024
Landscaping Inspection Passed 10/11/2024 10/08/2024