PRBD202207063
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Footing Inspection | Partial Pass | 8/22/2022 (2:30 - 3:30) | 8/22/2022 (PM) | 08/22/2022 |
Corrections:
Miscellaneous/Other
Comment Only
08/22/2022
Step extensions and partial sidewalk and patio… approved
|
||||
Footing Inspection | Not Ready | 8/24/2022 (2:30 - 3:30) | 8/24/2022 (PM) | 08/24/2022 |
Corrections:
Miscellaneous/Other
Comment Only
08/24/2022
Not ready for inspection.
|
||||
Footing Inspection | Passed | 8/26/2022 (12:30 - 2:30) | 8/26/2022 (PM) | 08/26/2022 |
Corrections:
Miscellaneous/Other
Comment Only
08/26/2022
Rebar in the grade slabs, footing dowels and depth at exit slab , and steps at patio… approved
|
||||
Footing Inspection | Passed | 8/29/2022 (12:30 - 2:30) | 8/29/2022 (PM) | 08/29/2022 |
Corrections:
Miscellaneous/Other
Comment Only
08/29/2022
Section of patio with rebar and portion of sidewalk that connects to city sidewalk, slope of sidewalk verified to comply with accessibility requirements…. Approved and ok to place concrete.
|
||||
Fire Inspection Final | Not Ready | 10/28/2022 (10:00 - 12:00) | 10/28/2022 (AM) | 10/28/2022 |
Building Final Inspection | Failed | 10/28/2022 (10:00 - 12:00) | 10/28/2022 (AM) | 10/28/2022 |
Corrections:
Miscellaneous/Other
Comment Only
10/28/2022
Not ready for any kind of final at this time this is a progress inspection.
See notes in the progress inspection dated 10/28/22
|
||||
Progress Inspection | Partial Pass | 10/28/2022 | ||
Corrections:
Miscellaneous/Other
Carried Forward
10/28/2022
Items to be completed for final of this patio.
1) complete fencing installation and install gates.
2) panic hardware to be installed at gates.
3) battery or Nuclear exit signs are needed at both gates and at the ramp exit.
4) install occupancy load signage as per load listed on plans.
|
||||
Building Final Inspection | Partial Pass | 11/3/2022 (10:00 - 12:00) | 11/3/2022 (AM) | 11/03/2022 |
Corrections:
Miscellaneous/Other
Comment Only
11/03/2022
Approved for temp final for the patio only, pending reinspection of the outstanding items listed.
|
||||
Miscellaneous/Other
Outstanding
11/03/2022
1) complete the fencing installation for the dog park area and the plexiglass installation at the gates.
2) nuclear exit signs are due to come in around 11/4/22… installation of these signs need to be done when they come in.
Call and set up the final for this permit and space when all is completed, this temp is valid for 10 days.
|
||||
Fire Inspection Final | Passed | 11/3/2022 (10:00 - 12:00) | 11/3/2022 (AM) | 11/03/2022 |
Building Final Inspection | Passed | 11/17/2022 (10:00 - 12:00) | 11/22/2022 | |
Corrections:
Miscellaneous/Other
Comment Only
11/22/2022
All remaining fencing and gates are installed, exit signage is in place as required. Final approved
|