Permit Application Status

PRBD202207063


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRBD202207063
Building
Finaled
EMPIRE IV BLOOMINGTON LLC
Other
Not Required
4,460 +/- SF Outdoor Patio (on grade), a 2,566 +/- sf Dog Walk (on grade), and associated sidewalks and patio elements.
06/16/2022
07/18/2022
05/21/2023
11/22/2022

Locations

Permits

Permit Number: PRBD202207063

Building
Finaled
07/18/2022
05/21/2023

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Footing Inspection Partial Pass 8/22/2022 (2:30 - 3:30) 8/22/2022 (PM) 08/22/2022
Corrections:


Miscellaneous/Other
Comment Only
08/22/2022
Step extensions and partial sidewalk and patio… approved

Footing Inspection Not Ready 8/24/2022 (2:30 - 3:30) 8/24/2022 (PM) 08/24/2022
Corrections:


Miscellaneous/Other
Comment Only
08/24/2022
Not ready for inspection.

Footing Inspection Passed 8/26/2022 (12:30 - 2:30) 8/26/2022 (PM) 08/26/2022
Corrections:


Miscellaneous/Other
Comment Only
08/26/2022
Rebar in the grade slabs, footing dowels and depth at exit slab , and steps at patio… approved

Footing Inspection Passed 8/29/2022 (12:30 - 2:30) 8/29/2022 (PM) 08/29/2022
Corrections:


Miscellaneous/Other
Comment Only
08/29/2022
Section of patio with rebar and portion of sidewalk that connects to city sidewalk, slope of sidewalk verified to comply with accessibility requirements…. Approved and ok to place concrete.

Fire Inspection Final Not Ready 10/28/2022 (10:00 - 12:00) 10/28/2022 (AM) 10/28/2022
Building Final Inspection Failed 10/28/2022 (10:00 - 12:00) 10/28/2022 (AM) 10/28/2022
Corrections:


Miscellaneous/Other
Comment Only
10/28/2022
Not ready for any kind of final at this time this is a progress inspection. See notes in the progress inspection dated 10/28/22

Progress Inspection Partial Pass 10/28/2022
Corrections:


Miscellaneous/Other
Carried Forward
10/28/2022
Items to be completed for final of this patio. 1) complete fencing installation and install gates. 2) panic hardware to be installed at gates. 3) battery or Nuclear exit signs are needed at both gates and at the ramp exit. 4) install occupancy load signage as per load listed on plans.

Building Final Inspection Partial Pass 11/3/2022 (10:00 - 12:00) 11/3/2022 (AM) 11/03/2022
Corrections:


Miscellaneous/Other
Comment Only
11/03/2022
Approved for temp final for the patio only, pending reinspection of the outstanding items listed.

Miscellaneous/Other
Outstanding
11/03/2022
1) complete the fencing installation for the dog park area and the plexiglass installation at the gates. 2) nuclear exit signs are due to come in around 11/4/22… installation of these signs need to be done when they come in. Call and set up the final for this permit and space when all is completed, this temp is valid for 10 days.

Fire Inspection Final Passed 11/3/2022 (10:00 - 12:00) 11/3/2022 (AM) 11/03/2022
Building Final Inspection Passed 11/17/2022 (10:00 - 12:00) 11/22/2022
Corrections:


Miscellaneous/Other
Comment Only
11/22/2022
All remaining fencing and gates are installed, exit signage is in place as required. Final approved