Summary

PRBD202208305
Building
Expired
MOAC MALL HOLDINGS LLC
Alteration/Repair/Replace
Not Required
Interior remodel of an existing retail space contained within an existing shell.
07/12/2022
07/21/2022
05/01/2023

Locations

Permits

Permit Number: PRBD202208305

Building
Expired
07/21/2022
05/01/2023

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Building Final Inspection Pending
Fire Inspection Final Pending
Framing Inspection Passed w/ Conditions 10/6/2022 (12:30 - 2:30) 10/6/2022 (PM) 10/06/2022
Corrections:


Miscellaneous/Other
Comment Only
10/06/2022
Existing ceiling, walls and soffits approved, pending electrical inspection prior to covering.

Building Final Inspection Failed 10/27/2022 (8:00 - 10:00) 10/27/2022 (AM) 10/27/2022
Corrections:


Miscellaneous/Other
Carried Forward
10/27/2022
Space needs to be completed and set up. Sprinkler heads are still covered and need to have the protective covers removed and the finish trim ring’s installed. Trades inspections need to be finaled prior to the building final. Call in for final inspection when all is completed and ready for final.

Fire Inspection Final Failed 10/27/2022 (8:00 - 10:00) 10/27/2022 (AM) 10/27/2022
Building Final Inspection Partial Pass 10/28/2022 (7:00 - 8:00) 10/28/2022 (AM) 10/28/2022
Corrections:


Miscellaneous/Other
Resolved
10/28/2022
Space needs to be completed and set up. Sprinkler heads are still covered and need to have the protective covers removed and the finish trim ring’s installed. Trades inspections need to be finaled prior to the building final. Call in for final inspection when all is completed and ready for final.

Miscellaneous/Other
Carried Forward
10/28/2022
1) install accessibility signage for fitting room. 2 complete small finish work. Set up final inspection when all is completed.

Miscellaneous/Other
Comment Only
10/28/2022
Approved for temp final and opening of store. See outstanding comments listed for correction and permit final.

Building Final Inspection Partial Pass 11/1/2022 (2:30 - 3:30) 11/1/2022 (PM) 11/01/2022
Corrections:


Miscellaneous/Other
Resolved
11/01/2022
1) install accessibility signage for fitting room. 2 complete small finish work. Set up final inspection when all is completed.

Miscellaneous/Other
Comment Only
11/01/2022
Still under a temp C.O. Electrical permit and outstanding items associated with it to be final, along with the fire final for this permit to be completed. Schedule final inspection when all of thes items are completed.

Fire Inspection Final Partial Pass 10/28/2022 (10:00 - 12:00) 10/28/2022 (AM) 11/02/2022