PRBD202210156
Building
Finaled
NORTHLAKE VENTURES-BLOOMINGTON LLC
Alteration/Repair/Replace
Not Required
Remodel approximately 9,000 sq feet on 1st floor of 9740 Grand Ave S including bathrooms including new entrance and bathrooms.
08/11/2022
09/13/2022
11/13/2023
05/17/2023

Locations

Permits

Permit Number: PRBD202210156

Building
Finaled
09/13/2022
11/13/2023

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Framing Inspection Partial Pass 12/9/2022 (8:00 - 10:00) 12/9/2022 (AM) 12/09/2022
Corrections:


Miscellaneous/Other
Carried Forward
12/09/2022
Corrections… 1) all the fire stops going through floor at all plumbing need to have the foam removed and the proper fire caulking used for the fire stops. Leave walls open for reinspection. 2) the back wall of the bathrooms is not properly secured at wall top and at ends of wall. Install metal framing to attach wall to. These corrections will need to be reinspected, call to schedule this reinspection…. #952-563-8930

Miscellaneous/Other
Comment Only
12/09/2022
Wall framing is approved. Ok to cover areas without plumbing. See outstanding comments for corrections and reinspection.

Framing Inspection Partial Pass 12/09/2022
Corrections:


Miscellaneous/Other
Carried Forward
12/09/2022
Corrections… 1) all the fire stops going through floor at all plumbing need to have the foam removed and the proper fire caulking used for the fire stops. Leave walls open for reinspection. 2) the back wall of the bathrooms is not properly secured at wall top and at ends of wall. Install metal framing to attach wall to. These corrections will need to be reinspected, call to schedule this reinspection…. #952-563-8930

Miscellaneous/Other
Comment Only
12/09/2022
Amendment to inspection report. Approval to insulate and cover only walls that have been approved by electrical inspection, and walls that do not have any electrical or plumbing in them. This does not include the vestibule or the framed soffits. Complete all trades work and call for inspections. Framing inspection to be called in when trades inspections are approved by inspection.

Framing Inspection Passed 12/14/2022 (12:30 - 2:30) 12/14/2022 (PM) 12/14/2022
Corrections:


Miscellaneous/Other
Resolved
12/14/2022
Corrections… 1) all the fire stops going through floor at all plumbing need to have the foam removed and the proper fire caulking used for the fire stops. Leave walls open for reinspection. 2) the back wall of the bathrooms is not properly secured at wall top and at ends of wall. Install metal framing to attach wall to. These corrections will need to be reinspected, call to schedule this reinspection…. #952-563-8930

Miscellaneous/Other
Comment Only
12/14/2022
Corrections with wall framing and fire stops at plumbing… approved. Ok to cover walls.

Fire Inspection Final Failed 3/13/2023 (12:30 - 2:30) 3/13/2023 (PM) 03/13/2023
Corrections:


Miscellaneous/Other
Carried Forward
03/13/2023
No permit pull and no sprinkler inspections completed. Add exit signs and emergency lighting. Ceiling tiles must me installed and sprinkler protection maintained.

Building Final Inspection Failed 3/13/2023 (12:30 - 2:30) 3/13/2023 (PM) 03/13/2023
Corrections:


Miscellaneous/Other
Carried Forward
03/13/2023
1) install exit signs with EM lighting as per discussion with contractor. 2) correct accessible signage to bathrooms. 3) obtain sprinkler permit and inspections for final. Will allow to occupy space on a temporary basis and under supervision. Call for inspections when these corrections are completed.

Building Final Inspection Passed w/ Conditions 5/17/2023 (2:30 - 3:30) 5/17/2023 (PM) 05/17/2023
Corrections:


Miscellaneous/Other
Resolved
05/17/2023
1) install exit signs with EM lighting as per discussion with contractor. 2) correct accessible signage to bathrooms. 3) obtain sprinkler permit and inspections for final. Will allow to occupy space on a temporary basis and under supervision. Call for inspections when these corrections are completed.

Miscellaneous/Other
Comment Only
05/17/2023
Final approved pending installation of Occupancy sign.

Fire Inspection Final Passed 5/17/2023 (2:30 - 3:30) 5/17/2023 (PM) 05/17/2023
Corrections:


Miscellaneous/Other
Outstanding
03/13/2023
No permit pull and no sprinkler inspections completed. Add exit signs and emergency lighting. Ceiling tiles must me installed and sprinkler protection maintained.