PRBD202210652
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Above Ceiling Inspection | Passed | 12/5/2022 (8:00 - 10:00) | 12/5/2022 (AM) | 12/05/2022 |
Electrical J box requires access panel, located above the gypsum ceiling upon final. | ||||
Framing Inspection | Passed | 12/5/2022 (8:00 - 10:00) | 12/5/2022 (AM) | 12/05/2022 |
4th floor Elevator lobby ceiling framing. | ||||
Fire Inspection Final | Passed | 1/5/2023 (8:00 - 10:00) | 1/5/2023 (AM) | 01/05/2023 |
Building Final Inspection | Passed | 1/5/2023 (8:00 - 10:00) | 1/5/2023 (AM) | 01/05/2023 |
4th floor elevator lobby with exit signs. |