PRBD202211162
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Lighting Inspection | Pending | |||
Taqueria Y Birreria Las Cuatro Milpas | ||||
Fire Inspection Final | Pending | |||
Lath Inspection | Pending | |||
Insulation Inspection | Pending | |||
Footing Inspection | Pending | |||
Framing Inspection | Pending | |||
Corrections:
Miscellaneous/Other
Outstanding
08/30/2023
Correction...
1) studs are to be fastened through the slots of the slotted slip track, not screwed to the track.
Reinspection needed for the framing by trash room.
|
||||
Progress Inspection | Pending | |||
Building Final Inspection | Pending | |||
Corrections:
Miscellaneous/Other
Outstanding
01/02/2025
Corrections....
1) ramp in storage requires handrails on each side.
2) trash room requires a stair and rails to get into room. Stairway to be minimal 36" width.
3) firestop any penetrations in trash room walls each side.
4) restrooms.... communal sink needs trap wraps and insulation at drain piping. Mirrors to be lowered to 40" to reflective edge from floor to mirror.
5) ambulatory stalls in each bathroom group to be 36" ... adjust accordingly.
6) hooks on doors to be within 48" height from floor.
7) Corrections as per EH.
8) make EM light in back hall operable.
9) install occupancy load signage.
10) Designate and install handicap parking signs at stalls and unloading zone.
|
||||
Framing Inspection | Partial Pass | 12/21/2022 (12:30 - 2:30) | 12/21/2022 (PM) | 12/21/2022 |
Corrections:
Miscellaneous/Other
Carried Forward
12/21/2022
Install deflection track at all walls that but up to bar joists or roof deck.
This correction To be inspected at next inspection.
|
||||
Miscellaneous/Other
Comment Only
12/21/2022
Wall framing has correction , see outstanding comments.
Partial pass on wall framing pending reinspection.
|
||||
Framing Inspection | Passed | 1/3/2023 (10:00 - 12:00) | 1/3/2023 (AM) | 01/03/2023 |
Corrections:
Miscellaneous/Other
Resolved
01/03/2023
Install deflection track at all walls that but up to bar joists or roof deck.
This correction To be inspected at next inspection.
|
||||
Miscellaneous/Other
Comment Only
01/03/2023
Framing and installation of deflection track to walls where needed… approved.
Spray foam insulation used to the exterior walls to meet R value… approved.
|
||||
Progress Inspection | Failed | 5/31/2023 (8:00 - 10:00) | 5/31/2023 (AM) | 05/31/2023 |
Corrections:
Miscellaneous/Other
Comment Only
05/31/2023
Footings have been complete at the section of th building tie in between the two builings and the trash room... no inspections were called in with the city. Special inspection reports are needed to be set to the city inspector.
Opening between the buildings are in the process of being cut on the addition building... framing inspection is required.
Interior of space ha exposed foam that needs to be covered by gypsum or an approved paint product for a fire covering.
|
||||
Framing Inspection | Passed | 7/24/2023 (8:00 - 10:00) | 7/24/2023 (AM) | 07/24/2023 |
Corrections:
Miscellaneous/Other
Comment Only
07/24/2023
Tie in framing between he two buildings for the enclosure shell... approved.
|
||||
Framing Inspection | Partial Pass | 8/30/2023 | 8/30/2023 (AM) | 08/30/2023 |
Corrections:
Miscellaneous/Other
Carried Forward
08/30/2023
Correction...
1) studs are to be fastened through the slots of the slotted slip track, not screwed to the track.
Reinspection needed for the framing by trash room.
|
||||
Miscellaneous/Other
Comment Only
08/30/2023
Insulation and framing around the added entry and the door openings... approved.
See outstanding comments for correction.
|
||||
Progress Inspection | Passed | 11/2/2023 (12:30 - 2:30) | 11/2/2023 (PM) | 11/02/2023 |
No C/O without the Plat filed with Hennepin County | ||||
Corrections:
Miscellaneous/Other
Comment Only
11/02/2023
Above ceiling and grid suppots in dry storage... approved
|
||||
Building Final Inspection | Not Ready | 1/2/2025 (8:00 - 10:00) | 1/2/2025 (AM) | 01/02/2025 |
Corrections:
Miscellaneous/Other
Carried Forward
01/02/2025
Corrections....
1) ramp in storage requires handrails on each side.
2) trash room requires a stair and rails to get into room. Stairway to be minimal 36" width.
3) firestop any penetrations in trash room walls each side.
4) restrooms.... communal sink needs trap wraps and insulation at drain piping. Mirrors to be lowered to 40" to reflective edge from floor to mirror.
5) ambulatory stalls in each bathroom group to be 36" ... adjust accordingly.
6) hooks on doors to be within 48" height from floor.
7) Corrections as per EH.
8) make EM light in back hall operable.
9) install occupancy load signage.
10) Designate and install handicap parking signs at stalls and unloading zone.
|
||||
Fire Inspection Final | Partial Pass | 1/2/2025 (8:00 - 10:00) | 1/2/2025 (AM) | 01/02/2025 |
Needs to make the following corrections: -Occupancy load sign for new area. -Add FDC sign and relocate waterflow notification device to the street side above FDC. -Mount new fire extinguishers. -Label door leading to the sprinkler riser. -Verify all exit signs/e-lights illuminate with power out. -Provide new keys for the knox box. -Remove all extension cords throughout the building. -Properly seal around the dry sidewall heads to the garbage room. [pmiller @ 01/02/2025 1:52 PM] |