PRBD202214300
There are no deposits or bonds for this permit application.
| Inspection | Outcome | Requested | Scheduled | Date Complete |
|---|---|---|---|---|
| Framing Inspection | Passed | 2/1/2023 (8:00 - 10:00) | 2/1/2023 (AM) | 02/01/2023 |
| Framing and fire proofing passed. Attain all trade inspections. | ||||
| Building Final Inspection | Not Ready | 4/5/2023 (8:00 - 10:00) | 4/5/2023 (AM) | 04/05/2023 |
| Floor 15. A. Patch missing fireproofing. B. Add exit signs and EM lighting. C.Final by fire marshal. | ||||
|
Corrections:
Miscellaneous/Other
Carried Forward
04/05/2023
A. Add exit signs with EM lighting. B. Patch small missing fireproofing on steel I beam. C. Final for: fire marshal, electrical, low voltage required, mechanical and electrical.
|
||||
| Fire Inspection Final | Passed | 4/5/2023 (8:00 - 10:00) | 4/5/2023 (AM) | 04/06/2023 |
| Building Final Inspection | Passed | 04/07/2023 | ||
| Floor 15, tenant buildout. Final Passed. | ||||
|
Corrections:
Miscellaneous/Other
Resolved
04/07/2023
A. Add exit signs with EM lighting. B. Patch small missing fireproofing on steel I beam. C. Final for: fire marshal, electrical low voltage, mechanical and electrical.
Final building inspection floor 15, tenant buildout.
|
||||