PRBD202214874
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Framing Inspection | Partial Pass | 2/22/2023 (12:30 - 2:30) | 2/22/2023 (PM) | 02/22/2023 |
7th floor for SFM that is moving from 6th floor. A. Patch fireproofing at areas discussed. B. Patch sheetrock at various areas. C. Using green exit signs having no emergency lighting. Contractor to provide Emergency Lighting for loss of power, and client to provide their own generator. Client is moving from 6th floor to 7th floor. Contractor has city inspectors cell phone. Inspector Brian Post | ||||
Fire Inspection Final | Passed w/ Conditions | 6/5/2023 (10:00 - 12:00) | 6/5/2023 (AM) | 06/05/2023 |
-Add “Pre-action system” sign on server room door. - Install fire extinguisher and cabinet near break room. - Add occupant load signs for conference rooms. | ||||
Building Final Inspection | Passed w/ Conditions | 6/5/2023 (10:00 - 12:00) | 6/5/2023 (AM) | 06/05/2023 |
Corrections:
Miscellaneous/Other
Comment Only
06/05/2023
Final electrical partial pass: pending office cube furniture.
Final fire pending (IT room ) seperate fire sprinkler protection system.
Final building to install missing accessible signage.
|