Permit Application Status

PRBD202214942


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRBD202214942
Building
Finaled
MOAC MALL HOLDINGS LLC
Alteration/Repair/Replace
Not Required
281 Central Pkwy, Bloomington, MN 55425 interior tenant improvements at C281 Museum of Illusions
12/02/2022
12/27/2022
10/25/2023

Locations

Property
0102724310017

Address
281 CENTRAL PKWY, BLOOMINGTON, MN 55425

0102724310017
281 Central Pkwy, Bloomington, MN 55425

Permits

Permit Number: PRBD202214942

Building
Finaled
12/27/2022
10/25/2023

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Framing Inspection Partial Pass 1/11/2023 (10:00 - 12:00) 1/11/2023 (AM) 01/11/2023
Corrections:


Miscellaneous/Other
Comment Only
01/11/2023
Viewed demising walls between tenants, walls approved for covering pending approval from electrical inspection. Note…the empty space tenant walls will need to be covered with gypsum on the tenant side to comply with code requirements for 1hr wall construction.

Framing Inspection Partial Pass 1/31/2023 (8:00 - 10:00) 1/31/2023 (AM) 01/31/2023
Corrections:


Miscellaneous/Other
Comment Only
01/31/2023
Wall rough in including storefront… approved

Fire Inspection Final Partial Pass 3/16/2023 (8:00 - 10:00) 3/16/2023 (AM) 03/16/2023
Framing Inspection Partial Pass 3/16/2023 (8:00 - 10:00) 3/16/2023 (AM) 03/16/2023
Corrections:


Miscellaneous/Other
Comment Only
03/16/2023
Exhibit room ceiling framing and above ceiling… approved to cover.

Progress Inspection Passed w/ Conditions 04/14/2023
Corrections:


Miscellaneous/Other
Outstanding
04/14/2023
1) Complete setup and cleaning. 2) Sprinkler heads all need to be uncovered and escutcheons to be installed, 3) Rear door to be installed along with panic hardware. 4) Occupancy signage to be installed by entry, load listed at 166 occupants. All inspections to be completed for final of all permits.

Miscellaneous/Other
Comment Only
04/14/2023
See outstanding comments for final inspection. The city will allow the completion of this space setup and also allow the occupants to train employees.

Building Final Inspection Not Ready 4/14/2023 (10:00 - 12:00) 4/14/2023 (AM) 04/14/2023
Corrections:


Miscellaneous/Other
Comment Only
04/14/2023
Not ready for final inspection. See the progress inspection dated 4/14/23 for all requirements.

Fire Inspection Final Not Ready 4/14/2023 (10:00 - 12:00) 4/14/2023 (AM) 04/21/2023
Building Final Inspection Partial Pass 4/27/2023 (8:00 - 10:00) 4/27/2023 (AM) 04/27/2023
Corrections:


Miscellaneous/Other
Comment Only
04/27/2023
1) Electrical final to be completed 2) fire final to be completed with recheck of extinguishers and electrical room lable signage. These items are contingent on the full final of this permit.

Fire Inspection Final Passed 4/27/2023 (8:00 - 10:00) 4/27/2023 (AM) 04/28/2023
Fire Inspection Final Passed 4/28/2023 (12:30 - 2:30) 4/28/2023 (PM) 04/28/2023
Building Final Inspection Passed w/ Conditions 04/28/2023
Corrections:


Miscellaneous/Other
Comment Only
04/28/2023
Final for this space is approved and is pending the final of the electrical permit for this buildout.

Building Final Inspection Passed w/ Conditions 4/28/2023 (12:30 - 2:30) 4/28/2023 (PM) 04/28/2023
Corrections:


Miscellaneous/Other
Comment Only
04/28/2023
Final for this space and permit approved, and is pending the final for the electrical permit for this buildout.