PRBD202215108
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Framing Inspection | Partial Pass | 1/10/2023 (8:00 - 10:00) | 1/10/2023 (AM) | 01/10/2023 |
Need to patch drywall for protection of structural elements and for ( corridor ) wall Rating. | ||||
Framing Inspection | Passed | 1/24/2023 (8:00 - 10:00) | 1/24/2023 (AM) | 01/24/2023 |
Provide for fire sprinkler above ceiling inspection. HVAC and electrical has passed above ceiling. | ||||
Building Final Inspection | Passed | 4/5/2023 (10:00 - 12:00) | 4/5/2023 (AM) | 04/05/2023 |
Suite 225, floor 2. Final passed. | ||||
Fire Inspection Final | Passed | 4/5/2023 (10:00 - 12:00) | 4/5/2023 (AM) | 04/06/2023 |