PRBD202300145
There are no deposits or bonds for this permit application.
| Inspection | Outcome | Requested | Scheduled | Date Complete |
|---|---|---|---|---|
| Framing Inspection | Passed w/ Conditions | 3/2/2023 (10:00 - 12:00) | 3/2/2023 (AM) | 03/02/2023 |
| A. No structural walls in AT&T existing space: ( floors 1, 2, 3.) B. non load bearing walls to existing ceiling grid. C. ALL - Existing and modified conference rooms, requires horn strobes and exit signage. | ||||
|
Corrections:
Miscellaneous/Other
Comment Only
03/02/2023
Framing - non load bearing steel studs, passed, with conditions of passing all trade inspections. Floors 1, 2, 3.
|
||||
| Building Final Inspection | Passed w/ Conditions | 8/29/2023 (12:30 - 2:30) | 8/29/2023 (PM) | 08/29/2023 |
| See correction comments in City View. | ||||
|
Corrections:
Miscellaneous/Other
Comment Only
08/29/2023
(Final building inspection passed,) but pending at this time until fire marshal final is passed. Thank you Jerry, with AT & T.
|
||||
| Fire Inspection Final | Failed | 8/29/2023 (12:30 - 2:30) | 8/29/2023 (PM) | 08/29/2023 |
| Length of dead-end in 3rd floor cubicle areas exceeds maximum allowable distance of 50'. | ||||
| Fire Inspection Final | Passed | 8/29/2023 | 08/30/2023 | |
| Dead end corridor does not apply because cubicle's are below 6 feet in height. | ||||