PRBD202300859
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Framing Inspection | Passed w/ Conditions | 3/8/2023 (10:00 - 12:00) | 3/8/2023 (AM) | 03/08/2023 |
Corrections:
Miscellaneous/Other
Comment Only
03/08/2023
Wall framing approved or all walls.
Call for fire stop inspection of piping going through floor, leave walls uncovered where piping is located.
|
||||
Above Ceiling Inspection | Passed | 4/10/2023 (8:00 - 10:00) | 4/10/2023 (AM) | 04/10/2023 |
Corrections:
Miscellaneous/Other
Comment Only
04/10/2023
Above ceiling and grid ceiling supports… approved. Ok to pad out ceiling.
|
||||
Building Final Inspection | Partial Pass | 4/27/2023 (10:00 - 12:00) | 4/27/2023 (AM) | 04/27/2023 |
Corrections:
Miscellaneous/Other
Carried Forward
04/27/2023
1) provide an accessible portion of counter at the cashwrap. (Dimensions were gone over with contractor.)
2) install fire extinguishers per fire inspection
3) bathroom piping through floor needs to be firestopped
Call for final inspection when these items are done
|
||||
Miscellaneous/Other
Comment Only
04/27/2023
Approved for temp final, with reinspection within 2 weeks from this inspection date.
See outstanding items to be done for the final.
|
||||
Fire Inspection Final | Partial Pass | 4/27/2023 (10:00 - 12:00) | 4/27/2023 (AM) | 04/28/2023 |
Corrections:
Miscellaneous/Other
Carried Forward
04/28/2023
Replace missing ceiling tiles and put up addressing
|
||||
Building Final Inspection | Passed w/ Conditions | 5/5/2023 (8:00 - 10:00) | 5/5/2023 (AM) | 05/05/2023 |
Corrections:
Miscellaneous/Other
Resolved
05/05/2023
1) provide an accessible portion of counter at the cashwrap. (Dimensions were gone over with contractor.)
2) install fire extinguishers per fire inspection
3) bathroom piping through floor needs to be firestopped
Call for final inspection when these items are done
|
||||
Miscellaneous/Other
Comment Only
05/05/2023
Outstanding items completed.
Final for this permit is approved pending....
Fire inspection final needed, set up inspection for full closing of this permit.
|
||||
Fire Inspection Final | Not Ready | 5/15/2023 (10:00 - 12:00) | 5/15/2023 (AM) | 05/15/2023 |
Corrections:
Miscellaneous/Other
Carried Forward
05/15/2023
Replace missing ceiling tiles and put up addressing
|
||||
Fire Inspection Final | Passed | 6/6/2023 (10:00 - 12:00) | 6/6/2023 (AM) | 06/06/2023 |
Corrections:
Miscellaneous/Other
Outstanding
05/15/2023
Replace missing ceiling tiles and put up addressing
|