PRBD202302324
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Framing Inspection | Passed | 2/14/2025 (8:00 - 10:00) | 2/14/2025 (AM) | 02/14/2025 |
Corrections:
Miscellaneous/Other
Comment Only
02/14/2025
framing and firestops within space approved.
Call for firestop inspection of the floor openings before concrete is placed, all metel backing and pins to be in place for inspection.
|
||||
Insulation Inspection | Passed | 2/21/2025 (8:00 - 10:00) | 2/21/2025 (AM) | 02/21/2025 |
Corrections:
Miscellaneous/Other
Comment Only
02/21/2025
This is not an insulation inspection, this is for in floor fire stops. All penetrations are firestopped from below, and holes from removed penetrations are sealed on the underside and pinned inside of concrete....ok to fill back with concrete.
|
||||
Building Final Inspection | Closed | 03/25/2025 | ||
Corrections:
Miscellaneous/Other
Comment Only
03/25/2025
Final for this permit is approved, see permit PRBD202416054 for other inspections and revised plans to scope of work.
|
||||
Fire Inspection Final | Closed | 03/25/2025 | ||
Corrections:
Miscellaneous/Other
Comment Only
03/25/2025
Final for this permit is approved, see permit PRBD202416054 for other inspections and revised plans to scope of work.
|