Summary

PRBD202306738
Building
Finaled
MOAC MALL HOLDINGS LLC
Alteration/Repair/Replace
Not Required
Inteior TI w/ minor MEP work Master Project: Nike - 227 WEST MARKET - 2023 Renovations MP2023007493
06/20/2023
08/23/2023
08/06/2024

Locations

Permits

Permit Number: PRBD202306738

Building
Finaled
08/23/2023
08/06/2024

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Progress Inspection Partial Pass 8/8/2023 (8:00 - 10:00) 8/30/2023 (AM) 08/30/2023
Corrections:


Miscellaneous/Other
Comment Only
08/30/2023
This was a informational inspection about the storefront framing and requirements.

Framing Inspection Partial Pass 9/20/2023 (8:00 - 10:00) 9/20/2023 (AM) 09/20/2023
Corrections:


Miscellaneous/Other
Comment Only
09/20/2023
Back of house wall framing approved to one side only. Leave open wall framing where any piping is run for inspection of the penetrations firestops.

Progress Inspection Partial Pass 9/27/2023 (8:00 - 10:00) 9/27/2023 (AM) 09/27/2023
Corrections:


Miscellaneous/Other
Comment Only
09/27/2023
Framing.... back oh house offices and stock room, and hallway... framing approved.... ok to cover both sides where firestops have been completed and inspected, and electrical has been approved.

Progress Inspection Passed 10/4/2023 (8:00 - 10:00) 10/4/2023 (AM) 10/04/2023
Corrections:


Miscellaneous/Other
Comment Only
10/04/2023
Framing repaired at existing wall... approved Firestops approved to through floor penetrations at wall, ok to cover wall.

Progress Inspection Passed 10/6/2023 (8:00 - 10:00) 10/6/2023 (AM) 10/06/2023
Corrections:


Miscellaneous/Other
Comment Only
10/06/2023
Fireproofing patching at beams and columns... approved Hard lid ceiling framing... approved

Progress Inspection Partial Pass 10/11/2023 (8:00 - 10:00) 10/11/2023 (AM) 10/11/2023
Corrections:


Miscellaneous/Other
Comment Only
10/11/2023
Storefront framing approved, pending electrical and fire sprinkler inspection before covering.hard lid ceilings in back areas, and drop ceiling framing in storage area... approved

Progress Inspection Passed 10/18/2023 (8:00 - 10:00) 10/18/2023 (AM) 10/18/2023
Corrections:


Miscellaneous/Other
Comment Only
10/18/2023
Work is ongoing, questions about inspections and what they can cover.

Progress Inspection Passed 10/25/2023 (8:00 - 10:00) 10/25/2023 (AM) 10/25/2023
Corrections:


Miscellaneous/Other
Comment Only
10/25/2023
Framing around columns, fire stops, and patched fireproofing... approved.

Progress Inspection Partial Pass 11/1/2023 (AM) 11/01/2023
Corrections:


Miscellaneous/Other
Comment Only
11/01/2023
Went over the mall requirements at the store front with the wood panels contractor installed and a compromised fix to comply with the requirements.

Progress Inspection Passed 11/14/2023 (8:00 - 10:00) 11/14/2023 (AM) 11/14/2023
Corrections:


Miscellaneous/Other
Comment Only
11/14/2023
Reviewed with job superintendent the store front and the cooridor wall. Storefront corrections are approved and meet the criteria for the mall. The wall has 2 layers of gypsum and has been approved by the security/ design team, no gypsum will be removed to install plywood.

Progress Inspection Passed 12/1/2023 (12:30 - 2:30) 12/1/2023 (PM) 12/01/2023
Corrections:


Miscellaneous/Other
Comment Only
12/01/2023
Fire stops at floor penetrations... approved

Fire Inspection Final Partial Pass 1/16/2024 (8:00 - 10:00) 1/16/2024 (AM) 01/16/2024
Building Final Inspection Partial Pass 1/16/2024 (8:00 - 10:00) 1/16/2024 (AM) 01/16/2024
Corrections:


Miscellaneous/Other
Carried Forward
01/16/2024
Items of correction and or completion.... 1) all tades inspections to be completed for final of his builout. 2) interior door in the path of exit to be contrasting in some way. 2) Install exir signage where missing 3) fitting room signage to be installed 4) no high shelf storge signage in storage rooms needed 5) complete remaining work in sales area.

Miscellaneous/Other
Comment Only
01/16/2024
See outstanding comments for the final inspection requirements. Today's inspection has pointed out items outstanding that need to be finished or corrected. Will allow the brand to stock as needed in the back areas. Final for this permit is not ready at this time.

Building Final Inspection Passed 2/6/2024 (8:00 - 10:00) 2/6/2024 (AM) 02/06/2024
Corrections:


Miscellaneous/Other
Resolved
02/06/2024
Items of correction and or completion.... 1) all tades inspections to be completed for final of his builout. 2) interior door in the path of exit to be contrasting in some way. 2) Install exir signage where missing 3) fitting room signage to be installed 4) no high shelf storge signage in storage rooms needed 5) complete remaining work in sales area.

Miscellaneous/Other
Comment Only
02/06/2024
Final for this space approved, ok to open to public.

Fire Inspection Final Passed 2/6/2024 (8:00 - 10:00) 2/6/2024 (AM) 02/08/2024