There are no deposits or bonds for this permit application.
| Inspection | Outcome | Requested | Scheduled | Date Complete |
|---|---|---|---|---|
| Investigation Inspection | Passed w/ Conditions | 7/12/2023 (12:30 - 2:30) | 7/12/2023 (PM) | 07/12/2023 |
|
Corrections:
Miscellaneous/Other
Outstanding
07/12/2023
Provide surveyed confirmation of side property line to determine adequate setback for garage. Provide truss manufacturers drawing for correction to trusses over front wall of garage. Submit all additional plan information requested by building inspection department for completion of permit processing for garage addition. Observed foam insulation in the floor cavity at mudroom OK to cover. Framing approved contingent on corrections noted above, OK to insulate at own risk.
|
||||
| Investigation Inspection | VOID | 08/08/2023 | ||
| Site investigation confirms 5 foot side set back to corner of garage as per survey conducted July 26. Approved. | ||||
| Insulation Inspection | Passed | 11/2/2023 (8:00 - 10:00) | 11/2/2023 (AM) | 11/02/2023 |
| Framing Inspection | Passed | 11/2/2023 (8:00 - 10:00) | 11/2/2023 (AM) | 11/02/2023 |
| Footing Inspection | Passed | 11/2/2023 (8:00 - 10:00) | 11/2/2023 (AM) | 11/02/2023 |
| Housewrap Inspection | Passed | 11/2/2023 (8:00 - 10:00) | 11/2/2023 (AM) | 11/02/2023 |
| Building Final Inspection | Issue TCO | 11/2/2023 (8:00 - 10:00) | 11/2/2023 (AM) | 11/02/2023 |
|
Corrections:
Miscellaneous/Other
Carried Forward
11/02/2023
Provide ladder in egress window well with depth exceeding 44 inches. 10 day temporary C.O. approved.
|
||||
| Building Final Inspection | Passed | 11/6/2023 (10:00 - 12:00) | 11/6/2023 (AM) | 11/06/2023 |
|
Corrections:
Miscellaneous/Other
Resolved
11/06/2023
Provide ladder in egress window well with depth exceeding 44 inches. 10 day temporary C.O. approved.
|
||||