PRBD202307105
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Fire Inspection Final | Pending | |||
Framing Inspection | Passed w/ Conditions | 9/7/2023 (10:00 - 12:00) | 9/7/2023 (AM) | 09/07/2023 |
Spec suite 125. | ||||
Corrections:
Miscellaneous/Other
Comment Only
09/07/2023
Spec suite prep for future tenant: Attain all trade inspections for walls and above ceilings.
|
||||
Building Final Inspection | Passed | 11/29/2023 (8:00 - 10:00) | 11/29/2023 (AM) | 11/29/2023 |
Suite 125. Final. | ||||
Corrections:
Miscellaneous/Other
Comment Only
11/29/2023
Final for suite 125.
|
||||
Fire Inspection Final | Failed | 11/29/2023 (8:00 - 10:00) | 11/29/2023 (AM) | 12/01/2023 |
Ensure all emergency lights are functioning. Remove wires resting on sprinkler piping. Call for inspection once baffles have been installed. |