PRBD202307129
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Framing Inspection | Passed | 12/13/2023 (8:00 - 10:00) | 12/13/2023 (AM) | 12/13/2023 |
Corrections:
Miscellaneous/Other
Comment Only
12/13/2023
Corridor framing, and tenant demising wall framing... approved
|
||||
Building Final Inspection | Not Ready | 1/16/2024 (12:30 - 2:30) | 1/16/2024 (PM) | 01/16/2024 |
Corrections:
Miscellaneous/Other
Carried Forward
01/16/2024
Corrections to be completed for this corridor final.
1) complete fire stop at top of wall beyond the double doors at dead end.
2) install strobe beyond the double doors as per fire inspection.
3) complete the mechanical ducting in cooridor.
Set up final inspection when completed.
|
||||
Fire Inspection Final | Not Ready | 1/16/2024 (12:30 - 2:30) | 1/16/2024 (PM) | 01/17/2024 |
Building Final Inspection | Passed | 02/09/2024 | ||
Corrections:
Miscellaneous/Other
Resolved
02/09/2024
Corrections to be completed for this corridor final.
1) complete fire stop at top of wall beyond the double doors at dead end.
2) install strobe beyond the double doors as per fire inspection.
3) complete the mechanical ducting in cooridor.
Set up final inspection when completed.
|
||||
Miscellaneous/Other
Comment Only
02/09/2024
Final for this scope of work and permit... approved
|
||||
Fire Inspection Final | Passed | 02/09/2024 |