PRBD202307293
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Footing Inspection | Passed w/ Conditions | 7/17/2023 (8:00 - 10:00) | 7/17/2023 (AM) | 07/17/2023 |
20x8 inch continuous concrete footing W 2#4 steel rebar continuous. Sugar sand soil for Radon poly over sand system, vented thru roof truss system. | ||||
Progress Inspection | Passed | 7/28/2023 (12:30 - 2:30) | 7/28/2023 (PM) | 07/31/2023 |
Exterior Foundation insulation by EXP w footing per plan. Insulation | ||||
Framing Inspection | Passed | 10/10/2023 (12:30 - 2:30) | 10/10/2023 (PM) | 06/24/2024 |
Main level framing and roof truss system passed. Call for basement framing when ready . Basement framing. Passed. | ||||
Corrections:
Miscellaneous/Other
Comment Only
10/10/2023
Framing main floor and lower level ( rear addition ) off existing home.
A. main floor walls and roof truss system, new-attic scuttle. Partial Passed.
B. Main floor windows with child fall guard. Passed.
C. call for basement framing when ready.
|
||||
Framing Inspection | Passed | 6/24/2024 (2:30 - 3:30) | 6/24/2024 (PM) | 06/24/2024 |
Basement framing. Passed | ||||
Corrections:
Miscellaneous/Other
Comment Only
06/24/2024
Basement framing, passed.
|
||||
Building Final Inspection | Passed | 6/24/2024 (2:30 - 3:30) | 6/24/2024 (PM) | 06/24/2024 |
Building final inspection, passed | ||||
Corrections:
Miscellaneous/Other
Comment Only
06/24/2024
Building final, passed.
|
||||
Housewrap Inspection | Passed | 6/24/2024 (2:30 - 3:30) | 6/24/2024 (PM) | 06/24/2024 |
Building final, passed | ||||
Insulation Inspection | Passed | 6/24/2024 (2:30 - 3:30) | 6/24/2024 (PM) | 06/24/2024 |
Insulation final, passed | ||||
Corrections:
Miscellaneous/Other
Comment Only
06/24/2024
Insulation final, passed
|
||||
Progress Inspection | Passed | 10/10/2023 (12:30 - 2:30) | 10/10/2023 (PM) | 06/24/2024 |
New Rear addition: main floor framing passed: and basement Progress framing. Call for basement framing when ready. | ||||
Corrections:
Miscellaneous/Other
Comment Only
06/24/2024
Final passed.
|
||||
Progress Inspection | Passed | 6/24/2024 (2:30 - 3:30) | 6/24/2024 (PM) | 06/24/2024 |
Progress inspection, passed. Building final passed. | ||||
Corrections:
Miscellaneous/Other
Comment Only
06/24/2024
Final passed
|