Permit Application Status

PRBD202307293


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRBD202307293
Building
Issued
CURRY, DEJA
Addition
Not Required
Addition onto the back of the house with a full unfinished basement
06/30/2023
07/14/2023
12/21/2024

Locations

Permits

Permit Number: PRBD202307293

Building
Expired
07/14/2023
12/21/2024

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Footing Inspection Passed w/ Conditions 7/17/2023 (8:00 - 10:00) 7/17/2023 (AM) 07/17/2023
20x8 inch continuous concrete footing W 2#4 steel rebar continuous. Sugar sand soil for Radon poly over sand system, vented thru roof truss system.
Progress Inspection Passed 7/28/2023 (12:30 - 2:30) 7/28/2023 (PM) 07/31/2023
Exterior Foundation insulation by EXP w footing per plan. Insulation
Framing Inspection Passed 10/10/2023 (12:30 - 2:30) 10/10/2023 (PM) 06/24/2024
Main level framing and roof truss system passed. Call for basement framing when ready . Basement framing. Passed.
Corrections:


Miscellaneous/Other
Comment Only
10/10/2023
Framing main floor and lower level ( rear addition ) off existing home. A. main floor walls and roof truss system, new-attic scuttle. Partial Passed. B. Main floor windows with child fall guard. Passed. C. call for basement framing when ready.

Framing Inspection Passed 6/24/2024 (2:30 - 3:30) 6/24/2024 (PM) 06/24/2024
Basement framing. Passed
Corrections:


Miscellaneous/Other
Comment Only
06/24/2024
Basement framing, passed.

Building Final Inspection Passed 6/24/2024 (2:30 - 3:30) 6/24/2024 (PM) 06/24/2024
Building final inspection, passed
Corrections:


Miscellaneous/Other
Comment Only
06/24/2024
Building final, passed.

Housewrap Inspection Passed 6/24/2024 (2:30 - 3:30) 6/24/2024 (PM) 06/24/2024
Building final, passed
Insulation Inspection Passed 6/24/2024 (2:30 - 3:30) 6/24/2024 (PM) 06/24/2024
Insulation final, passed
Corrections:


Miscellaneous/Other
Comment Only
06/24/2024
Insulation final, passed

Progress Inspection Passed 10/10/2023 (12:30 - 2:30) 10/10/2023 (PM) 06/24/2024
New Rear addition: main floor framing passed: and basement Progress framing. Call for basement framing when ready.
Corrections:


Miscellaneous/Other
Comment Only
06/24/2024
Final passed.

Progress Inspection Passed 6/24/2024 (2:30 - 3:30) 6/24/2024 (PM) 06/24/2024
Progress inspection, passed. Building final passed.
Corrections:


Miscellaneous/Other
Comment Only
06/24/2024
Final passed