Permit Application Status

PRBD202309900


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRBD202309900
Building
Expired
MOAC MALL HOLDINGS LLC
Alteration/Repair/Replace
Mercantile
Tenant Improvement at Mall of America. All Architectural, Mechanical, Plumbing, and Electrical for a complete build-out. (Remodel only work - demo is under PRBD202310150)
08/21/2023
09/20/2023
05/06/2024

Locations

Permits

Permit Number: PRBD202309900

Building
Expired
09/20/2023
05/06/2024

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Building Final Inspection Pending
Framing Inspection Partial Pass 9/25/2023 (8:00 - 10:00) 9/25/2023 (AM) 09/25/2023
Corrections:


Miscellaneous/Other
Carried Forward
09/25/2023
Corrections for next inspection. 1) fire proof remaining portion of beam at storefront, call for inspection prior to covering. 2) patch holes in mall bulkhead and close up the corner opening with bulkhead. Call in and set up inspection of these items. Provide photo of topside hard lid to be installed at back cooridor.

Miscellaneous/Other
Comment Only
09/25/2023
Approved to cover walls and the remaining layer on lid to the back cooridor entry. See outstanding comments for next inspection.

Framing Inspection Passed 9/27/2023 (12:30 - 2:30) 9/27/2023 (PM) 09/27/2023
Corrections:


Miscellaneous/Other
Resolved
09/27/2023
Corrections for next inspection. 1) fire proof remaining portion of beam at storefront, call for inspection prior to covering. 2) patch holes in mall bulkhead and close up the corner opening with bulkhead. Call in and set up inspection of these items. Provide photo of topside hard lid to be installed at back cooridor.

Miscellaneous/Other
Comment Only
09/27/2023
Corrections at mall bulkhead completed for the fireproofing and patching. Above ceiling at storefront only was viewed and approved to cover.

Progress Inspection Passed 11/2/2023 (8:00 - 10:00) 11/2/2023 (AM) 11/02/2023
Corrections:


Miscellaneous/Other
Comment Only
11/02/2023
Above ceiling and install of grid... approved

Fire Inspection Final Passed 11/8/2023 (12:30 - 2:30) 11/8/2023 (PM) 11/08/2023
Building Final Inspection Partial Pass 11/8/2023 (12:30 - 2:30) 11/8/2023 (PM) 11/08/2023
Corrections:


Miscellaneous/Other
Comment Only
11/08/2023
Temp final approved. Call for EH final and electrical final. Building final is pending other thrades final.