PRBD202312227
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Framing Inspection | Passed | 10/31/2023 (8:00 - 10:00) | 10/31/2023 (AM) | 10/26/2023 |
Corrections:
Miscellaneous/Other
Comment Only
10/26/2023
Existing framing... firestops approved
|
||||
Above Ceiling Inspection | Passed w/ Conditions | 10/31/2023 (12:30 - 2:30) | 10/31/2023 (PM) | 10/31/2023 |
Corrections:
Miscellaneous/Other
Comment Only
10/31/2023
Corrections,...
1) install fire stop at drain piping located through the floor of the pizza place below.
2) install pipe standoff to the drain pipe going to looor drain of the dip sink piping.
These items will be checked at final inspection
|
||||
Building Final Inspection | Not Ready | 11/1/2023 (12:30 - 2:30) | 11/1/2023 (PM) | 11/01/2023 |
Corrections:
Miscellaneous/Other
Comment Only
11/01/2023
Final not approved. Corrections needed with plumbing per EH requirements. Relocated ovens also need to have an exhaust system and sprinkler coverage above them... this issue is being worked on with contractor.
Call in for all inspections.
Per EH, this space may be used for sales of products, but no bakig can be done. EH will allow product to be baked and brought from the store located at 366 North and sold at 242 East.
|
||||
Fire Inspection Final | Not Ready | 11/1/2023 (12:30 - 2:30) | 11/1/2023 (PM) | 11/02/2023 |
Building Final Inspection | Passed | 11/8/2023 (12:30 - 2:30) | 11/8/2023 (PM) | 11/08/2023 |
Corrections:
Miscellaneous/Other
Comment Only
11/08/2023
Final approved, pending any EH requirements that will be followed up by EH.
|
||||
Fire Inspection Final | Passed | 11/8/2023 (12:30 - 2:30) | 11/8/2023 (PM) | 11/08/2023 |