PRBD202314460
There are no deposits or bonds for this permit application.
| Inspection | Outcome | Requested | Scheduled | Date Complete |
|---|---|---|---|---|
| Building Final Inspection | Pending | |||
| Framing Inspection | Passed | 2/22/2024 (12:30 - 2:30) | 2/22/2024 (PM) | 05/03/2024 |
| A. Patch all penetrations above ceiling height. B. Existing roof deck flutes are stuffed with mineral wool. C. Steel stud framing passed. D. CALL FOR REINSPECTION WHEN READY. | ||||
|
Corrections:
Miscellaneous/Other
Resolved
05/03/2024
A. Patch all gypsum wall penetrations above new ceiling with 5/8 inch gypsum B. Existing Roof deck flutes are stuffed with mineral wool. C.Framing passed. D. Call for (city fire marshal sprinkler pipe inspection FROM above ceiling prior to covering. E. Call for framing reinspection by building inspector Brian Post.
F. Assure all mechanical, plumbing, electrical, fire sprinkler, environmental health are passed, prior to covering. Passed.
|
||||
|
Miscellaneous/Other
Comment Only
05/03/2024
Framing and above ceiling, Passed.
|
||||
|
All corrections have been made.
Comment Only
05/03/2024
All corrections have been made.
|
||||
| Above Ceiling Inspection | Passed | 5/6/2024 (10:00 - 12:00) | 5/6/2024 (AM) | 05/03/2024 |
| Above ceiling corrections. passed | ||||
|
Corrections:
Miscellaneous/Other
Comment Only
05/03/2024
Framing, above ceiling, passed.
|
||||
| Framing Inspection | Passed | 5/3/2024 (8:00 - 10:00) | 5/3/2024 (AM) | 05/03/2024 |
| Framing walls, and above ceiling. Passed | ||||
|
Corrections:
Miscellaneous/Other
Comment Only
05/03/2024
Framing and above ceiling inspection. Passed.
|
||||
| Framing Inspection | Not Ready | 5/6/2024 (10:00 - 12:00) | 5/6/2024 (AM) | 05/06/2024 |
| Final building inspection - not ready. Need all trade inspections and fire marshal final, and environment final, and sign permit final approved, prior to building final. | ||||
|
Corrections:
Miscellaneous/Other
Outstanding
05/06/2024
A. Patch all gypsum wall penetrations above new ceiling with 5/8 inch gypsum B. Existing Roof deck flutes are stuffed with mineral wool. C.Framing passed. D. Call for (city fire marshal sprinkler pipe inspection above ceiling, prior to covering. ( E. Call for framing final inspection by building inspector Brian Post, when all permits and trade inspections are final approved passed.)
F. Assure all mechanical, plumbing, electrical, fire sprinkler, environmental health, exterior sign
permit, parking lot stripping and handicap accessible signage, are passed, prior to covering.
|
||||
| Building Final Inspection | Issue TCO | 5/8/2024 | 5/8/2024 (AM) | 05/08/2024 |
| Building final, partial pass. A. Need to have electrical final on sign permit. B. Need planning division to inspect light level of the exterior sign, prior to building final. C. Temp CO PASSED. | ||||
|
Corrections:
Miscellaneous/Other
Comment Only
05/08/2024
Temp CO. Passed. A. Need exterior sign electrical final inspection. B. Need city planning division to inspect the light illumination level of the exterior signage. Please contact city of Bloomington and ask for the planning division, to schedule this night time illumination light level test, prior to issuing you the final building inspection.
|
||||
| Fire Inspection Final | Passed | 5/8/2024 (8:00 - 10:00) | 5/8/2024 (AM) | 05/09/2024 |