PRBD202400688
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Above Ceiling Inspection | Passed | 2/26/2024 (12:30 - 2:30) | 2/26/2024 (PM) | 02/26/2024 |
Corrections:
Miscellaneous/Other
Comment Only
02/26/2024
Insulated duct and the attachment to existing duct approved.
|
||||
Building Final Inspection | Passed | 2/26/2024 (12:30 - 2:30) | 2/26/2024 (PM) | 02/26/2024 |
Corrections:
Miscellaneous/Other
Comment Only
02/26/2024
This permit should have been a mechanical permit for the run of ductwork attached to the existing ductwork in the shaft for exhaust and odor control that was relocated to a new location within the space for the ovens. No duct detectors are needed in exhaust ducts, and sprinkler protection is in place and was inspected as with the previous remodeling.
Baltech tested CFM of this exhaust duct and its pulling 2100 CFM's where mall provides 2500 CFM of makeup air. This installation is approved, and ok to move equipment to the new location.
|
||||
Fire Inspection Final | Passed | 2/26/2024 (12:30 - 2:30) | 2/26/2024 (PM) | 02/28/2024 |