Summary

PRBD202402261
Building
Finaled
INTERNATIONAL PLAZA
Alteration/Repair/Replace
Business
Commercial office building new tenant fit-out of an existing office space.
02/27/2024
03/29/2024
07/05/2025
01/06/2025

Locations

Permits

Permit Number: PRBD202402261

Building
Finaled
03/29/2024
07/05/2025

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Framing Inspection Passed 4/23/2024 (12:30 - 2:30) 4/23/2024 (PM) 06/17/2024
Steel stud framing - passed, but need many holes thru walls to other tenants, fire caulked with 2 hr fire caulk.
Corrections:


Miscellaneous/Other
Resolved
06/17/2024
Framing passed, but partial pass due to many holes to other tenant's. Use requires 2 hour fire caulk. Partial pass to return to inspect fire caulk above ceilings.

Framing Inspection Passed w/ Conditions 6/17/2024 (10:00 - 12:00) 6/17/2024 (AM) 06/17/2024
A. Framing passed. B. (NOTE, Need mechanical rough and fire sprinkler rough in inspection, passed for above ceiling, prior to covering.
Corrections:


Miscellaneous/Other
Comment Only
06/17/2024
A. Fire caulk passed. B. Comment, slope floor along existing ADA COUNTER TOP, AS DISCUSSED, TO ACHIEVE 34 INCHES ON ABOVE FLOOR TO MEET ADA. C. Need mechanical and fire sprinkle rough in inspection passed.

Building Final Inspection Passed 8/29/2024 (2:30 - 3:30) 8/29/2024 (PM) 08/29/2024
Corrections:


Miscellaneous/Other
Comment Only
08/29/2024
Building final approved, pending fire inspection final to close permit.

Fire Inspection Final Not Ready 8/29/2024 (2:30 - 3:30) 8/29/2024 (PM) 09/06/2024
Fire Inspection Final Passed 01/06/2025