PRBD202403376


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRBD202403376
Building
Finaled
IKEA PROPERTY INC
Alteration/Repair/Replace
Not Required
Seeking approval to replace our current smoke/heat vents which are currently a central controlled solution to a fusible link option. Supporting documentation is attached as well as a smoke/heat vent proposed by our roofing vendor.
03/21/2024
06/11/2024
03/30/2025
10/01/2024

Locations

Permits

Permit Number: PRBD202403376

Building
Finaled
06/11/2024
03/30/2025

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Building Final Inspection Partial Pass 7/15/2024 (10:00 - 12:00) 7/15/2024 (AM) 07/15/2024
Corrections:


Miscellaneous/Other
Carried Forward
07/15/2024
Due to the added insulation to roof deck, the plumbing vents will need to be extended in height as well to 12" above finished roofing. The smoke/heat vents are not installed at this time, they are scheduled to come in about the middle of August. Final inspection will b needed at that time.

Fire Inspection Final Partial Pass 7/15/2024 (10:00 - 12:00) 7/15/2024 (AM) 07/16/2024
Building Final Inspection Not Ready 9/6/2024 (8:00 - 10:00) 9/6/2024 (AM) 09/06/2024
Corrections:


Miscellaneous/Other
Resolved
09/06/2024
Due to the added insulation to roof deck, the plumbing vents will need to be extended in height as well to 12" above finished roofing. The smoke/heat vents are not installed at this time, they are scheduled to come in about the middle of August. Final inspection will b needed at that time.

Miscellaneous/Other
Carried Forward
09/06/2024
Correction... due to the smoke /heat vents on roof having a higher force in cold weather climates to latch the Manufacture requires a lever to close units once opened. Obtain this device and any added hardware for this device to be attached along with the lever to aid in closing these units once opened.

Miscellaneous/Other
Comment Only
09/06/2024
Venting at roof has been extended as required. See the outstanding comments for correction and set up final inspection when the devices needed are installed and/or accessible.

Fire Inspection Final Passed 9/6/2024 (8:00 - 10:00) 9/6/2024 (AM) 09/26/2024
Building Final Inspection Passed 10/01/2024
Corrections:


Miscellaneous/Other
Resolved
10/01/2024
Correction... due to the smoke /heat vents on roof having a higher force in cold weather climates to latch the Manufacture requires a lever to close units once opened. Obtain this device and any added hardware for this device to be attached along with the lever to aid in closing these units once opened.

Miscellaneous/Other
Comment Only
10/01/2024
The hardware that may be needed to close the hatches as recommended by manufacture is up to the contractor to provide and the facility to have on hand to aid in closing the hatches. As for the installation and functionality of the hatches.... approved.