Summary

PRBD202404747
Building
Finaled
NORTH PAD DEVELOPMENT LLC
Alteration/Repair/Replace
Not Required
Edikted is an apparel and accessory brand moving into a space within the Mall Of America. The space and will require new finishes, buildouts, furniture all meeting MOA's design criteria. The space will be receiving a new storefront, a full height glazed system.
04/16/2024
05/02/2024
12/18/2024
06/21/2024

Locations

Permits

Permit Number: PRBD202404747

Building
Finaled
05/02/2024
12/18/2024

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Framing Inspection Passed 5/6/2024 (8:00 - 10:00) 5/6/2024 (AM) 05/06/2024
Corrections:


Miscellaneous/Other
Comment Only
05/06/2024
Wall framing of backof house fitting rooms and hallway... approved

Framing Inspection Passed 5/10/2024 (10:00 - 12:00) 5/10/2024 (AM) 05/10/2024
Corrections:


Miscellaneous/Other
Comment Only
05/10/2024
Wall framing in store sales area... approved

Framing Inspection Passed 5/23/2024 (12:30 - 2:30) 5/23/2024 (PM) 05/23/2024
Corrections:


Miscellaneous/Other
Comment Only
05/23/2024
Above ceiling and fireproofing... approved

Framing Inspection Passed 6/5/2024 (10:00 - 12:00) 6/5/2024 (AM) 06/05/2024
Corrections:


Miscellaneous/Other
Comment Only
06/05/2024
Storefront framing... approved Ok to bring stock into the existing store room only, no stock in the sales area.

Building Final Inspection Not Ready 6/12/2024 (12:30 - 2:30) 6/12/2024 (PM) 06/12/2024
Corrections:


Miscellaneous/Other
Carried Forward
06/12/2024
This was a consultation inspection for future final. Items to be completed... 1) add leg to accessible counter at cashwrap that wont interfere with a wheelchair where it is to be held up. Install accessible signage at the section of counter for identification of Accessibility. 2) complete accessible fitting rooms and install accessible signage. 3) door from sales area to exit needs to be identified as a door, varous options were proposed to contractor. 4) install fire extinguishers. 5) final for electrical to be approved for temp or final. The front glass is not scheduled to come in and be installed till friday night. As per conversation with mall project manager, he will verify the installation prior to letting the store open. Temp final inspection is scheduled for 6/13/24.

Fire Inspection Final Not Ready 6/12/2024 (12:30 - 2:30) 6/12/2024 (PM) 06/12/2024
Building Final Inspection Partial Pass 6/13/2024 (2:30 - 3:30) 6/13/2024 (PM) 06/13/2024
Corrections:


Miscellaneous/Other
Outstanding
06/13/2024
Items to be completed for final reinspection. 1) install exit plaque on the wood covered door leading to the rear exit. 2) install the bench and accessible signage at the fitting room. 3) install accessible signage at the accessible portion of the cashwrap. Glass at front entry windows is scheduled to be installed on friday night, the mall representative to verify prior to allowing this space to open.

Miscellaneous/Other
Comment Only
06/13/2024
See the outstanding comments for items to be completed by contractor. The city will allow the owners to stock the front sales area with direction and due to liability, that a representative of the company be there when any work is yet to be done by contractors. The mall representative agreed to verify the front glass at entry is installed before letting the store open for business on Saturday (6/15). Light fixtures are not all installed, and electrical permit is not final. The city will allow a temp occupancy of this space at this time pending the front glass installation and outstanding items installed. Final inspection to be completed when all work is completed and permits are satisfied.

Fire Inspection Final Passed 6/14/2024 (8:00 - 10:00) 6/14/2024 (AM) 06/20/2024
Building Final Inspection Passed 6/21/2024 (7:00 - 8:00) 6/21/2024 (AM) 06/21/2024
Corrections:


Miscellaneous/Other
Resolved
06/21/2024
This was a consultation inspection for future final. Items to be completed... 1) add leg to accessible counter at cashwrap that wont interfere with a wheelchair where it is to be held up. Install accessible signage at the section of counter for identification of Accessibility. 2) complete accessible fitting rooms and install accessible signage. 3) door from sales area to exit needs to be identified as a door, varous options were proposed to contractor. 4) install fire extinguishers. 5) final for electrical to be approved for temp or final. The front glass is not scheduled to come in and be installed till friday night. As per conversation with mall project manager, he will verify the installation prior to letting the store open. Temp final inspection is scheduled for 6/13/24.

Miscellaneous/Other
Comment Only
06/21/2024
Final approved