Permit Application Status

PRBD202405941


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRBD202405941
Building
Permit(s) Issued
POLAR SEMICONDUCTOR INC
Alteration/Repair/Replace
Not Required
Phase II - Infill existing loading dock with processed chilled water plant and exterior wall assembly, MEP upgrades in Phase III - Remodeling existing manufacturing areas, adding interior H-4 gas room, adding prayer/ablution rooms, remodeling accessible toilet rooms. Polar Semiconductor is proposing an interior remodel of existing buildings P1, P2, and P3 and a 3,750 square foot electrical room addition between buildings P2 and P3. The project aims to improve Polar Semiconductor’s manufacturing capabilities and increase the production of semiconductor products. The project will be executed throughout multiple phases with construction occurring over the course of multiple years. Roughly ninety percent of the scope of work is interior remodeling, mechanical/electrical upgrades, and tool installations for Polar Semiconductor’s manufacturing processes.
05/07/2024
10/04/2024
10/12/2025

Locations

Permits

Permit Number: PRBD202405941

Building
Issued
10/04/2024
10/12/2025

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Fire Inspection Final Pending
Building Final Inspection Pending
Framing Inspection Passed 3/18/2025 (10:00 - 12:00) 3/18/2025 (AM) 03/18/2025
Corrections:


Miscellaneous/Other
Outstanding
03/18/2025
Phase 2 framing... approved

Framing Inspection Passed 4/15/2025 (10:00 - 12:00) 4/15/2025 (AM) 04/15/2025
Corrections:


Miscellaneous/Other
Comment Only
04/15/2025
SCM room framing approved