Permit Application Status

PRBD202406428


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRBD202406428
Building
Finaled
MOAC MALL HOLDINGS LLC
Alteration/Repair/Replace
Not Required
NO CHANGE IN USE / OCCUPANCY TYPE OR TENANT. MINOR INTERIOR RENOVATION OF EXISTING RETAIL TENANT SPACE: A. NEW SALES FIXTURES, FURNITURE & FINISHES. B. EXISTING CEILING AND LIGHT FIXTURES TO REMAIN. C. EXISTING DEMISING WALLS TO REMAIN. INSTALL OF NEW NON-LOAD BEARING FURRING PARTITIONS. D. EXISTING ELECTRICAL OUTLETS AND EQUIPMENT TO REMAIN. GC TO RE-LOCATE, MODIFY AND INSTALL NEW AS NEEDED TO MATCH QUANTITIES ON PLAN. E. EXISTING PLUMBING FIXTURES TO REMAIN. F. EXISTING MECHANICAL UNIT AND DUCTWORK TO REMAIN. G. EXISTING STORAGE RACKS AT BOH TO REMAIN. H. EXISTING STOREFRONT FRAME AND GLAZING TO REMAIN. EXISTING SPRINKLER AND FIRE PROTECTION SYSTEMS TO REMAIN. ANY MODIFICATION TO THE FIRE ALARM AND SPRINKLER SYSTEMS SHALL BE SUBMITTED SEPARATELY AS REQUIRED BY THE BUILDING DEPARTMENT AND FIRE MARSHALL.
05/16/2024
01/08/2025
08/03/2025
02/04/2025

Locations

Permits

Permit Number: PRBD202406428

Building
Finaled
01/08/2025
08/03/2025

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Framing Inspection Passed 1/21/2025 (2:30 - 3:30) 1/21/2025 (PM) 01/21/2025
Corrections:


Miscellaneous/Other
Comment Only
01/21/2025
Framing approved

Progress Inspection Passed w/ Conditions 01/31/2025
Corrections:


Miscellaneous/Other
Outstanding
01/31/2025
Not ready for final inspection at this time. Corrections... 1) emergency lighting to be checked and operable, this includes the bug eye lighting at the exit signs.( rear exit em lighting is not functional) 2) space needes to be set up with fixtures so inspector can determine aisle width for acces along with exiting. 3) boxes and storage in the storerooms canot be within 18" of sprinkler coverage, adjust storage as needed to comply. Approval is given for space to be setup and stocked.

Building Final Inspection Not Ready 1/31/2025 (12:30 - 2:30) 1/31/2025 (PM) 01/31/2025
Corrections:


Miscellaneous/Other
Comment Only
01/31/2025
Not ready for final, see todays progress inspection report for corrections.

Fire Inspection Final Not Ready 1/31/2025 (10:00 - 12:00) 1/31/2025 (AM) 01/31/2025
Fire Inspection Final Passed 2/4/2025 (8:00 - 10:00) 2/4/2025 (AM) 02/04/2025
Building Final Inspection Passed 2/4/2025 (8:00 - 10:00) 2/4/2025 (AM) 02/04/2025
Corrections:


Miscellaneous/Other
Comment Only
02/04/2025
Final for this scope of work and permit approved