PRBD202408082
Building
Finaled
STEADY COUNTRYSIDE LLC
Alteration/Repair/Replace
Assembly, general, community halls, libraries, museums, churches
Adding a new Bathroom, 16ft wall two doors, take down a closet and set two water fountains, some repair on the sheet rock, paint all the walls, extend wall for two 36"doors, epoxy all flooring with base board.
06/21/2024
07/26/2024
04/02/2025
10/03/2024

Locations

Permits

Permit Number: PRBD202408082

Building
Finaled
07/26/2024
04/02/2025

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Framing Inspection Passed w/ Conditions 7/29/2024 (10:00 - 12:00) 7/29/2024 (AM) 07/29/2024
Need trade permits for (electrical, plumbing, HVAC, FIRE SPRINKLER), and exterior signage.
Corrections:


Miscellaneous/Other
Comment Only
07/29/2024
Framing passed. A. Need trade permits for plumbing, hvac, electrical, and a planning permit for exterior signage.

Building Final Inspection Failed 9/13/2024 (10:00 - 12:00) 9/13/2024 (AM) 09/13/2024
Corrections:


Miscellaneous/Other
Carried Forward
09/13/2024
1. Provide exit sign over rear exit. 2. Grab bars in new toilet room must meet ADA requirements. 3. Need final plumbing, mechanical, electrical and fire approvals. 4. Complete installation of front entry doors. 5. Provide copy of city approved plans for final inspection.

Fire Inspection Final Failed 9/13/2024 (10:00 - 12:00) 9/13/2024 (AM) 09/13/2024
Shall add an exit sign at the main entrance and rear exit. Shall have sprinkler contractor adjust sprinkler heads to provide approved coverage. Add fire extinguisher.
Building Final Inspection Failed 9/17/2024 (8:00 - 10:00) 9/17/2024 (AM) 09/17/2024
Corrections:


Miscellaneous/Other
Carried Forward
09/17/2024
1. Provide exit sign over rear exit. 2. Grab bars in new toilet room must meet ADA requirements. 3. Need final plumbing, mechanical, electrical and fire approvals. 4. Complete installation of front entry doors. 5. Provide copy of city approved plans for final inspection.

Miscellaneous/Other
Carried Forward
09/17/2024
Note, toilet room, grab bar corrections have been made to meet ADA. Still need installation of front entry doors and rear exit sign. Still need final fire approval.

Fire Inspection Final Passed 10/1/2024 (10:00 - 12:00) 10/1/2024 (AM) 10/01/2024
Building Final Inspection Passed 10/3/2024 (10:00 - 12:00) 10/3/2024 (AM) 10/03/2024
Corrections:


Miscellaneous/Other
Resolved
10/03/2024
1. Provide exit sign over rear exit. 2. Grab bars in new toilet room must meet ADA requirements. 3. Need final plumbing, mechanical, electrical and fire approvals. 4. Complete installation of front entry doors. 5. Provide copy of city approved plans for final inspection.

Miscellaneous/Other
Resolved
10/03/2024
Note, toilet room, grab bar corrections have been made to meet ADA. Still need installation of front entry doors and rear exit sign. Still need final fire approval.