PRBD202409851
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Fire Inspection Final | Pending | 12/6/2024 (12:30 - 2:30) | 12/6/2024 (PM) | |
Building Final Inspection | Pending | 12/6/2024 (12:30 - 2:30) | 12/6/2024 (PM) | |
Framing Inspection | Pending | 12/6/2024 (12:30 - 2:30) | 12/6/2024 (PM) | |
Corrections:
Miscellaneous/Other
Outstanding
10/21/2024
( Need Electrical rough in for exterior signage, ) not ready
( Need Low voltage rough in for interior electrical ) not ready
|
||||
Framing Inspection | Partial Pass | 9/30/2024 (10:00 - 12:00) | 9/30/2024 (AM) | 09/30/2024 |
Site meeting with diversified construction. Start of project. | ||||
Framing Inspection | Partial Pass | 10/21/2024 (10:00 - 12:00) | 10/21/2024 (AM) | 10/21/2024 |
A. Framing( Interior steel stud Framing) Passed. B. (Electrical rough in for interior tenant space) Passed. C. (Need electrical rough in for exterior signage) not ready. D. Need Plumbing underground rough ln passed. D. NEED to mineral wool and FIRE caulk, all roof deck flutes. Pending. | ||||
Corrections:
Miscellaneous/Other
Outstanding
10/21/2024
( Need Electrical rough in for exterior signage, ) not ready
( Need Low voltage rough in for interior electrical ) not ready
|
||||
Progress Inspection | Passed | 11/8/2024 (10:00 - 12:00) | 11/8/2024 (AM) | 11/08/2024 |
Above ceiling inspection, stuff flutes and firecaulking, passed. |