Permit Application Status

PRBD202409851


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRBD202409851
Building
Finaled
KRAUS-ANDERSON INC
Alteration/Repair/Replace
Business
Interior remodel of an existing space
07/29/2024
09/11/2024
06/09/2025
12/11/2024

Locations

Permits

Permit Number: PRBD202409851

Building
Finaled
09/11/2024
06/09/2025

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Framing Inspection Partial Pass 9/30/2024 (10:00 - 12:00) 9/30/2024 (AM) 09/30/2024
Site meeting with diversified construction. Start of project.
Framing Inspection Partial Pass 10/21/2024 (10:00 - 12:00) 10/21/2024 (AM) 10/21/2024
A. Framing( Interior steel stud Framing) Passed. B. (Electrical rough in for interior tenant space) Passed. C. (Need electrical rough in for exterior signage) not ready. D. Need Plumbing underground rough ln passed. D. NEED to mineral wool and FIRE caulk, all roof deck flutes. Pending.
Corrections:


Miscellaneous/Other
Outstanding
10/21/2024
( Need Electrical rough in for exterior signage, ) not ready ( Need Low voltage rough in for interior electrical ) not ready

Progress Inspection Passed 11/8/2024 (10:00 - 12:00) 11/8/2024 (AM) 11/08/2024
Above ceiling inspection, stuff flutes and firecaulking, passed.
Fire Inspection Final Passed 12/6/2024 (12:30 - 2:30) 12/6/2024 (PM) 12/06/2024
Framing Inspection Passed 12/6/2024 (12:30 - 2:30) 12/6/2024 (PM) 12/06/2024
Corrections:


Miscellaneous/Other
Outstanding
10/21/2024
( Need Electrical rough in for exterior signage, ) not ready ( Need Low voltage rough in for interior electrical ) not ready

Building Final Inspection Passed w/ Conditions 12/6/2024 (12:30 - 2:30) 12/6/2024 (PM) 12/11/2024
Need plumbing final by Dave Spaeth.
Corrections:


Miscellaneous/Other
Comment Only
12/11/2024
Building final passed with condition, to attain plumbing final by Dave Spaeth.