PRBD202412120
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Housewrap Inspection | Pending | |||
Fire Inspection Final | Pending | |||
Building Final Inspection | Pending | |||
Progress Inspection | Passed w/ Conditions | 11/8/2024 (10:00 - 12:00) | 11/8/2024 (AM) | 11/08/2024 |
Jon Aaron to do all building inspections. | ||||
Corrections:
Miscellaneous/Other
Comment Only
11/08/2024
Jon Aaron to do all building inspections.
|
||||
Progress Inspection | Passed | 11/12/2024 (8:00 - 10:00) | 11/12/2024 (AM) | 11/12/2024 |
Corrections:
Miscellaneous/Other
Comment Only
11/12/2024
Demo is in progress, covered walkways are being built at entry and exits as work progresses.
|
||||
Footing Inspection | Passed | 11/13/2024 (12:30 - 2:30) | 11/13/2024 (PM) | 11/13/2024 |
Corrections:
Miscellaneous/Other
Comment Only
11/13/2024
3 stoop footings with rebar as per plan, on east side of building... approved
|
||||
Footing Inspection | Passed | 11/27/2024 (10:00 - 12:00) | 11/27/2024 (AM) | 11/27/2024 |
Per John Aaron. Passed. | ||||
Corrections:
Miscellaneous/Other
Comment Only
11/27/2024
Two pier footins on east side near starbucks... footing rebar as per plans, and depth approved.
Inspection done by Jon A.
|
||||
Progress Inspection | Passed | 12/02/2024 | ||
Corrections:
Miscellaneous/Other
Comment Only
12/02/2024
2 piers on east side of building.... approved
|
||||
Progress Inspection | Passed | 12/06/2024 | ||
Corrections:
Miscellaneous/Other
Comment Only
12/06/2024
Peirs at starbucks location of SE corner of building... approved
|
||||
Progress Inspection | Passed | 12/11/2024 | ||
Corrections:
Miscellaneous/Other
Comment Only
12/11/2024
2 stoop footings on south side of building... approved
|
||||
Progress Inspection | Passed | 12/30/2024 | ||
Corrections:
Miscellaneous/Other
Comment Only
12/30/2024
Stoop footingsat the entryways to 98 pounds buffet... approved
|
||||
Framing Inspection | Passed | 1/6/2025 (10:00 - 12:00) | 1/6/2025 (AM) | 01/06/2025 |
Corrections:
Miscellaneous/Other
Comment Only
01/06/2025
Today's inspection was going over the details and next portion of the framing at storefronts, and what is being done with the roof tie in. The next framing inspection will have all the framing in place for inspection of the area where the contractor has started.
|
||||
Progress Inspection | Passed | 01/08/2025 | ||
Corrections:
Miscellaneous/Other
Comment Only
01/08/2025
Stoop footing and extension to existing footing at starbucks... approved
Partial framing of the east side facade and roof at starbucks. Approved to cover this section.
|
||||
Framing Inspection | Passed | 1/24/2025 (12:30 - 2:30) | 1/24/2025 (PM) | 01/24/2025 |
SE Corner-inspection | ||||
Corrections:
Miscellaneous/Other
Comment Only
01/24/2025
Framing along the starbucks space of the far east and the E/ north to south direction.... approved
|