Permit Application Status

PRBD202412120


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRBD202412120
Building
Permit(s) Issued
ENGELSMA LLOYD
Not Required
Renovation of the exterior Clover Shopping Center to include removal of existing canopy roof, new storefronts, roof patching, replace sidewalks, new exterior finishes to include stucco, brick, precast, Nichiha siding and electrical lighting fixtures.
09/13/2024
10/31/2024
07/23/2025

Locations

Permits

Permit Number: PRBD202412120

Building
Issued

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Housewrap Inspection Pending
Fire Inspection Final Pending
Building Final Inspection Pending
Progress Inspection Passed w/ Conditions 11/8/2024 (10:00 - 12:00) 11/8/2024 (AM) 11/08/2024
Jon Aaron to do all building inspections.
Corrections:


Miscellaneous/Other
Comment Only
11/08/2024
Jon Aaron to do all building inspections.

Progress Inspection Passed 11/12/2024 (8:00 - 10:00) 11/12/2024 (AM) 11/12/2024
Corrections:


Miscellaneous/Other
Comment Only
11/12/2024
Demo is in progress, covered walkways are being built at entry and exits as work progresses.

Footing Inspection Passed 11/13/2024 (12:30 - 2:30) 11/13/2024 (PM) 11/13/2024
Corrections:


Miscellaneous/Other
Comment Only
11/13/2024
3 stoop footings with rebar as per plan, on east side of building... approved

Footing Inspection Passed 11/27/2024 (10:00 - 12:00) 11/27/2024 (AM) 11/27/2024
Per John Aaron. Passed.
Corrections:


Miscellaneous/Other
Comment Only
11/27/2024
Two pier footins on east side near starbucks... footing rebar as per plans, and depth approved. Inspection done by Jon A.

Progress Inspection Passed 12/02/2024
Corrections:


Miscellaneous/Other
Comment Only
12/02/2024
2 piers on east side of building.... approved

Progress Inspection Passed 12/06/2024
Corrections:


Miscellaneous/Other
Comment Only
12/06/2024
Peirs at starbucks location of SE corner of building... approved

Progress Inspection Passed 12/11/2024
Corrections:


Miscellaneous/Other
Comment Only
12/11/2024
2 stoop footings on south side of building... approved

Progress Inspection Passed 12/30/2024
Corrections:


Miscellaneous/Other
Comment Only
12/30/2024
Stoop footingsat the entryways to 98 pounds buffet... approved

Framing Inspection Passed 1/6/2025 (10:00 - 12:00) 1/6/2025 (AM) 01/06/2025
Corrections:


Miscellaneous/Other
Comment Only
01/06/2025
Today's inspection was going over the details and next portion of the framing at storefronts, and what is being done with the roof tie in. The next framing inspection will have all the framing in place for inspection of the area where the contractor has started.

Progress Inspection Passed 01/08/2025
Corrections:


Miscellaneous/Other
Comment Only
01/08/2025
Stoop footing and extension to existing footing at starbucks... approved Partial framing of the east side facade and roof at starbucks. Approved to cover this section.

Framing Inspection Passed 1/24/2025 (12:30 - 2:30) 1/24/2025 (PM) 01/24/2025
SE Corner-inspection
Corrections:


Miscellaneous/Other
Comment Only
01/24/2025
Framing along the starbucks space of the far east and the E/ north to south direction.... approved