PRBD202412961
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Footing Inspection | Pending | |||
Above Ceiling Inspection | Pending | |||
Insulation Inspection | Pending | |||
Lath Inspection | Pending | |||
Gypsum Board/Sheet Rock Inspection | Pending | |||
Fire Inspection Final | Pending | |||
Building Final Inspection | Pending | |||
Framing Inspection | Partial Pass | 09/25/2024 | ||
Corrections:
Miscellaneous/Other
Comment Only
09/25/2024
Exterior wall framing for fist floor, at line 8, grids A through E.
Wall line on grid E, lines 8-9
|
||||
Framing Inspection | Passed | 09/27/2024 | ||
Corrections:
Miscellaneous/Other
Comment Only
09/27/2024
Exterior wall framing of level 1, at grid B, line 4-7
Grid A, line 7' to 9
|
||||
Lighting Inspection | VOID | 5/31/2025 | 12/18/2024 | |
Landscaping Inspection | VOID | 5/31/2025 | 12/18/2024 |